Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
36
matching recommendationsSIC | 3672 | Printed Circuit Boards |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0149 # 09 Y:1998 | 09 | 1998 | REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL | $117,000 | $400,000 | Implemented |
SF0149 # 08 Y:1998 | 08 | 1998 | INSTALL SENSORS TO DETECT DEFECTS | $80,000 | $40,000 | Implemented |
SF0149 # 07 Y:1998 | 07 | 1998 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $780 | $145 | Not Implemented |
SF0149 # 06 Y:1998 | 06 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,627 | $25,680 | Implemented |
SF0149 # 05 Y:1998 | 05 | 1998 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,333 | $5,522 | Not Implemented |
SF0149 # 04 Y:1998 | 04 | 1998 | INSTALL OCCUPANCY SENSORS | $844 | $2,640 | Not Implemented |
SF0149 # 03 Y:1998 | 03 | 1998 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $555 | $495 | Not Implemented |
SF0149 # 02 Y:1998 | 02 | 1998 | TURN OFF EQUIPMENT WHEN NOT IN USE | $368 | $0 | Implemented |
SF0149 # 01 Y:1998 | 01 | 1998 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $690 | $15 | Implemented |
CO0423 # 04 Y:1998 | 04 | 1998 | SEPARATE TREATMENTS FOR EACH TYPE OF SOLUTION AND RECYCLE | $8,870 | $2,500 | Implemented |
CO0423 # 07 Y:1998 | 07 | 1998 | USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS | $2,350 | $6,900 | Implemented |
CO0423 # 06 Y:1998 | 06 | 1998 | SEPARATE TREATMENTS FOR EACH TYPE OF SOLUTION AND RECYCLE | $2,580 | $25,000 | Implemented |
CO0423 # 05 Y:1998 | 05 | 1998 | ALLOW DRAINAGE BEFORE WITHDRAWING OBJECT | $4,550 | $2,000 | Implemented |
CO0423 # 03 Y:1998 | 03 | 1998 | MINIMIZE WATER USAGE | $9,100 | $11,210 | Implemented |
CO0423 # 02 Y:1998 | 02 | 1998 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $140 | $420 | Implemented |
CO0423 # 01 Y:1998 | 01 | 1998 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $850 | $1,000 | Not Implemented |
WI0326 # 10 Y:1998 | 10 | 1998 | REMOVE SLUDGE FROM TANKS ON A REGULAR BASIS | $300 | $0 | Not Implemented |
WI0326 # 01 Y:1998 | 01 | 1998 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $52,640 | $25,000 | Not Implemented |
WI0326 # 02 Y:1998 | 02 | 1998 | USE REVERSE OSMOSIS TO CONCENTRATE MATERIAL | $43,913 | $40,000 | Not Implemented |
WI0326 # 03 Y:1998 | 03 | 1998 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $11,269 | $20,000 | Not Implemented |
WI0326 # 04 Y:1998 | 04 | 1998 | REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF | $7,874 | $12,186 | Not Implemented |
WI0326 # 05 Y:1998 | 05 | 1998 | USE A RAG RECYCLE SERVICE | $4,430 | $0 | Not Implemented |
WI0326 # 06 Y:1998 | 06 | 1998 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,348 | $12,500 | Not Implemented |
WI0326 # 07 Y:1998 | 07 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,948 | $740 | Not Implemented |
WI0326 # 08 Y:1998 | 08 | 1998 | INSTALL TIMERS AND/OR THERMOSTATS | $504 | $400 | Not Implemented |