IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

246

matching recommendations
Reset
SIC 3674 Semiconductors And Related Devices
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0184 # 04 Y:1990 04 1990 AIR CONDITION ONLY SPACE NECESSARY $8,590 $1,300 Implemented
CO0184 # 06 Y:1990 06 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,280 $2,100 Implemented
CO0185 # 01 Y:1990 01 1990 INSTALL TIMERS AND/OR THERMOSTATS $2,780 $750 Implemented
CO0185 # 03 Y:1990 03 1990 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $2,390 $200 Implemented
CO0185 # 04 Y:1990 04 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,620 $50 Implemented
CO0185 # 05 Y:1990 05 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,010 $300 Implemented
CO0183 # 02 Y:1990 02 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,300 $5,000 Implemented
CO0183 # 04 Y:1990 04 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,240 $2,000 Implemented
CO0183 # 05 Y:1990 05 1990 UTILIZE A LESS EXPENSIVE COOLING METHOD $10,356 $44,000 Implemented
OR0006 # 02 Y:1987 02 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,009 $8,000 Implemented
OR0006 # 03 Y:1987 03 1987 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $8,718 $1,000 Implemented
OR0006 # 05 Y:1987 05 1987 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $718 $200 Implemented
OR0006 # 06 Y:1987 06 1987 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,143 $600 Implemented
OR0006 # 07 Y:1987 07 1987 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $874 $1,320 Implemented
CO0033 # 01 Y:1985 01 1985 REDUCE VENTILATION AIR $27,000 $399 Implemented
CO0033 # 02 Y:1985 02 1985 REDUCE VENTILATION AIR $7,279 $824 Implemented
CO0033 # 03 Y:1985 03 1985 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,343 $4,000 Implemented
CO0033 # 05 Y:1985 05 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $655 $3,000 Implemented
CO0033 # 06 Y:1985 06 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $173 $200 Implemented
CO0033 # 07 Y:1985 07 1985 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $134 $162 Implemented
CO0033 # 08 Y:1985 08 1985 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,006 $3,619 Implemented