IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

70

matching recommendations
Reset
SIC 3674 Semiconductors And Related Devices
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0511 # 09 Y:2002 09 2002 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $100 $0 Not Implemented
CO0511 # 08 Y:2002 08 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $340 $0 Not Implemented
CO0511 # 07 Y:2002 07 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $370 $300 Not Implemented
CO0511 # 06 Y:2002 06 2002 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,290 $1,200 Not Implemented
CO0511 # 05 Y:2002 05 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,420 $190 Implemented
CO0511 # 04 Y:2002 04 2002 USE HEAT PUMP FOR SPACE CONDITIONING $4,020 $0 Not Implemented
CO0511 # 03 Y:2002 03 2002 INSULATE BARE EQUIPMENT $4,380 $990 Not Implemented
CO0511 # 02 Y:2002 02 2002 OPTIMIZE PLANT POWER FACTOR $10,160 $14,010 Not Implemented
CO0511 # 01 Y:2002 01 2002 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $12,040 $9,500 Not Implemented
CO0349 # 05 Y:1995 05 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,860 $4,470 Not Implemented
CO0349 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,640 $54,100 Implemented
CO0349 # 02 Y:1995 02 1995 RECOVER AND REUSE COOLING WATER $18,410 $2,190 Implemented
CO0349 # 03 Y:1995 03 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,690 $7,000 Implemented
CO0349 # 04 Y:1995 04 1995 INSTALL OCCUPANCY SENSORS $3,030 $2,280 Not Implemented
CO0349 # 06 Y:1995 06 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,690 $470 Not Implemented
CO0349 # 07 Y:1995 07 1995 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $990 $10,410 Not Implemented
CO0315 # 06 Y:1994 06 1994 UTILIZE A LESS EXPENSIVE COOLING METHOD $410 $2,000 Not Implemented
CO0315 # 01 Y:1994 01 1994 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $7,950 $30 Implemented
CO0315 # 02 Y:1994 02 1994 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $1,290 $0 Not Implemented
CO0315 # 03 Y:1994 03 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,070 $1,770 Implemented
CO0315 # 05 Y:1994 05 1994 RECOVER WASTE HEAT FROM EQUIPMENT $630 $650 Not Implemented
CO0315 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,010 $5,310 Implemented
CO0293 # 04 Y:1994 04 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,290 $1,810 Not Implemented
CO0293 # 03 Y:1994 03 1994 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,500 $1,600 Not Implemented
CO0293 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,220 $9,380 Implemented