IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

88

matching recommendations
Reset
SIC 3674 Semiconductors And Related Devices
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SJ0009 # 09 Y:2024 09 2024 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,761 $2,675 Not Implemented
SJ0009 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $67,746 $441,525 Not Implemented
SJ0009 # 02 Y:2024 02 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,869 $18,228 Not Implemented
SJ0009 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $764 $32 Implemented
SJ0009 # 03 Y:2024 03 2024 INSTALL OCCUPANCY SENSORS $1,699 $844 Implemented
SJ0009 # 06 Y:2024 06 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $469 $0 Not Implemented
SJ0009 # 05 Y:2024 05 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,705 $0 Implemented
SJ0009 # 08 Y:2024 08 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $513 $624 Implemented
SJ0009 # 07 Y:2024 07 2024 INSULATE BARE EQUIPMENT $8 $200 Implemented
SJ0009 # 10 Y:2024 10 2024 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $147 $50 Implemented
SF0585 # 04 Y:2022 04 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $897 $400 Implemented
SF0585 # 07 Y:2022 07 2022 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $17,102 $105,401 Not Implemented
SF0585 # 05 Y:2022 05 2022 DEVELOP A REPAIR/REPLACE POLICY $3,867 $8,345 Implemented
SF0585 # 01 Y:2022 01 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $1,341 $0 Implemented
SF0585 # 02 Y:2022 02 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $10,174 $2,893 Implemented
SF0585 # 03 Y:2022 03 2022 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $23,840 $8,000 Not Implemented
SF0585 # 06 Y:2022 06 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $95,415 $561,099 Not Implemented
SF0560 # 04 Y:2020 04 2020 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $13,118 $45,851 Implemented
SF0560 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,246 $70 Not Implemented
SF0560 # 02 Y:2020 02 2020 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $16,680 $26,850 Not Implemented
SF0560 # 05 Y:2020 05 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $15,645 $78,611 Implemented
SF0560 # 03 Y:2020 03 2020 INSTALL OCCUPANCY SENSORS $4,726 $14,983 Implemented
SF0528 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,330 $22,874 Implemented
SF0528 # 03 Y:2018 03 2018 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $8,178 $27,403 Not Implemented
SF0528 # 01 Y:2018 01 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,402 $11,547 Not Implemented