Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
70
matching recommendationsSIC | 3674 | Semiconductors And Related Devices |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0511 # 09 Y:2002 | 09 | 2002 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $100 | $0 | Not Implemented |
CO0511 # 08 Y:2002 | 08 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $340 | $0 | Not Implemented |
CO0511 # 07 Y:2002 | 07 | 2002 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $370 | $300 | Not Implemented |
CO0511 # 06 Y:2002 | 06 | 2002 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $2,290 | $1,200 | Not Implemented |
CO0511 # 05 Y:2002 | 05 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,420 | $190 | Implemented |
CO0511 # 04 Y:2002 | 04 | 2002 | USE HEAT PUMP FOR SPACE CONDITIONING | $4,020 | $0 | Not Implemented |
CO0511 # 03 Y:2002 | 03 | 2002 | INSULATE BARE EQUIPMENT | $4,380 | $990 | Not Implemented |
CO0511 # 02 Y:2002 | 02 | 2002 | OPTIMIZE PLANT POWER FACTOR | $10,160 | $14,010 | Not Implemented |
CO0511 # 01 Y:2002 | 01 | 2002 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $12,040 | $9,500 | Not Implemented |
CO0349 # 05 Y:1995 | 05 | 1995 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,860 | $4,470 | Not Implemented |
CO0349 # 01 Y:1995 | 01 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20,640 | $54,100 | Implemented |
CO0349 # 02 Y:1995 | 02 | 1995 | RECOVER AND REUSE COOLING WATER | $18,410 | $2,190 | Implemented |
CO0349 # 03 Y:1995 | 03 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,690 | $7,000 | Implemented |
CO0349 # 04 Y:1995 | 04 | 1995 | INSTALL OCCUPANCY SENSORS | $3,030 | $2,280 | Not Implemented |
CO0349 # 06 Y:1995 | 06 | 1995 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,690 | $470 | Not Implemented |
CO0349 # 07 Y:1995 | 07 | 1995 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $990 | $10,410 | Not Implemented |
CO0315 # 06 Y:1994 | 06 | 1994 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $410 | $2,000 | Not Implemented |
CO0315 # 01 Y:1994 | 01 | 1994 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $7,950 | $30 | Implemented |
CO0315 # 02 Y:1994 | 02 | 1994 | USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES | $1,290 | $0 | Not Implemented |
CO0315 # 03 Y:1994 | 03 | 1994 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,070 | $1,770 | Implemented |
CO0315 # 05 Y:1994 | 05 | 1994 | RECOVER WASTE HEAT FROM EQUIPMENT | $630 | $650 | Not Implemented |
CO0315 # 04 Y:1994 | 04 | 1994 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,010 | $5,310 | Implemented |
CO0293 # 04 Y:1994 | 04 | 1994 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,290 | $1,810 | Not Implemented |
CO0293 # 03 Y:1994 | 03 | 1994 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,500 | $1,600 | Not Implemented |
CO0293 # 02 Y:1994 | 02 | 1994 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,220 | $9,380 | Implemented |