Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
46
matching recommendationsSIC | 3674 | Semiconductors And Related Devices |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0369 # 06 Y:1996 | 06 | 1996 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $919 | $0 | Implemented |
MA0369 # 05 Y:1996 | 05 | 1996 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,541 | $3,401 | Not Implemented |
MA0369 # 04 Y:1996 | 04 | 1996 | USE MAGNETIC TECHNOLOGY TO TREAT WATER | $2,500 | $850 | Not Implemented |
MA0369 # 03 Y:1996 | 03 | 1996 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $4,903 | $8,750 | Not Implemented |
MA0369 # 02 Y:1996 | 02 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,735 | $49,531 | Not Implemented |
MA0369 # 01 Y:1996 | 01 | 1996 | ADOPT IN-HOUSE MATERIAL GENERATION | $21,886 | $11,000 | Implemented |
AS0183 # 02 Y:1996 | 02 | 1996 | INSTALL TIMERS AND/OR THERMOSTATS | $2,116 | $3,200 | Not Implemented |
AS0184 # 15 Y:1996 | 15 | 1996 | TREAT AND REUSE RINSE WATERS | $6,042 | $22,500 | Not Implemented |
AS0184 # 14 Y:1996 | 14 | 1996 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,827 | $1,200 | Implemented |
AS0184 # 13 Y:1996 | 13 | 1996 | INSTALL OCCUPANCY SENSORS | $3,057 | $2,475 | Not Implemented |
AS0184 # 12 Y:1996 | 12 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $207 | $800 | Not Implemented |
AS0184 # 11 Y:1996 | 11 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $27,847 | $54,958 | Implemented |
AS0184 # 10 Y:1996 | 10 | 1996 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,519 | $2,240 | Not Implemented |
AS0184 # 09 Y:1996 | 09 | 1996 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $315 | $0 | Not Implemented |
AS0184 # 08 Y:1996 | 08 | 1996 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,954 | $4,163 | Implemented |
AS0184 # 06 Y:1996 | 06 | 1996 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $10,968 | $6,000 | Not Implemented |
AS0184 # 05 Y:1996 | 05 | 1996 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $15,892 | $35,000 | Implemented |
AS0184 # 04 Y:1996 | 04 | 1996 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $21,398 | $25,000 | Implemented |
AS0184 # 03 Y:1996 | 03 | 1996 | INSTALL TIMERS AND/OR THERMOSTATS | $1,233 | $2,880 | Not Implemented |
AS0184 # 02 Y:1996 | 02 | 1996 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $4,108 | $1,750 | Implemented |
AS0184 # 01 Y:1996 | 01 | 1996 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $9,415 | $7,000 | Implemented |
AS0183 # 09 Y:1996 | 09 | 1996 | MINIMIZE WATER USAGE | $1,890 | $491 | Not Implemented |
AS0183 # 08 Y:1996 | 08 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,873 | $11,962 | Implemented |
AS0183 # 01 Y:1996 | 01 | 1996 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $14,536 | $7,000 | Not Implemented |
AS0183 # 03 Y:1996 | 03 | 1996 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $4,440 | $20,000 | Implemented |