IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
Reset
SIC 3674 Semiconductors And Related Devices
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0528 # 06 Y:2003 06 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,940 $10,310 Not Implemented
CO0528 # 05 Y:2003 05 2003 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $5,720 $13,150 Not Implemented
CO0528 # 04 Y:2003 04 2003 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,000 $3,000 Not Implemented
CO0528 # 01 Y:2003 01 2003 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $20,940 $4,360 Implemented
CO0528 # 02 Y:2003 02 2003 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $13,340 $14,640 Not Implemented
CO0528 # 03 Y:2003 03 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,850 $16,010 Not Implemented
TA0059 # 06 Y:2003 06 2003 REPAIR FAULTY LOUVERS AND DAMPERS $2,040 $625 Not Implemented
TA0059 # 05 Y:2003 05 2003 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $2,100 $585 Not Implemented
TA0059 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,890 $200 Implemented
TA0059 # 03 Y:2003 03 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,885 $7,671 Implemented
TA0059 # 02 Y:2003 02 2003 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $5,536 $500 Not Implemented
TA0059 # 01 Y:2003 01 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $9,950 $0 Not Implemented
AS0347 # 09 Y:2003 09 2003 CLEAR AND RENT EXISTING SPACE $15,165 $11,220 n/a
AS0347 # 08 Y:2003 08 2003 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $64,137 $800 Not Implemented
AS0347 # 07 Y:2003 07 2003 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $27,104 $6,400 Not Implemented
AS0347 # 06 Y:2003 06 2003 REUSE / RECYCLE/ SELL PAPER PRODUCTS $720 $40 Implemented
AS0347 # 05 Y:2003 05 2003 INSULATE BARE EQUIPMENT $3,155 $14 Not Implemented
AS0347 # 04 Y:2003 04 2003 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $10,657 $18,000 Not Implemented
AS0347 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,837 $60 Implemented
AS0347 # 02 Y:2003 02 2003 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $8,330 $8,920 Implemented
AS0347 # 01 Y:2003 01 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $1,462 $0 Implemented