IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

158

matching recommendations
Reset
SIC 3675 Electronic Capacitors
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0228 # 04 Y:2006 04 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,427 $2,500 Implemented
LE0228 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,503 $100 Implemented
LE0228 # 06 Y:2006 06 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $988 $1,700 Implemented
LE0228 # 07 Y:2006 07 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $315 $750 Not Implemented
LE0228 # 08 Y:2006 08 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,856 $43,904 Not Implemented
SU0219 # 07 Y:2005 07 2005 DISCONNECT BALLASTS $6,107 $5,363 Implemented
SU0219 # 06 Y:2005 06 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $40,969 $38,400 Not Implemented
SU0219 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,948 $721 Implemented
SU0219 # 04 Y:2005 04 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $15,286 $502 Implemented
SU0219 # 03 Y:2005 03 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,356 $0 Implemented
SU0219 # 02 Y:2005 02 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,400 $0 Not Implemented
SU0219 # 01 Y:2005 01 2005 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $15,621 $0 Implemented
SU0219 # 08 Y:2005 08 2005 INSTALL OCCUPANCY SENSORS $1,137 $1,726 Not Implemented
SU0219 # 09 Y:2005 09 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $694 $1,262 Not Implemented
SU0219 # 10 Y:2005 10 2005 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $276 $509 Not Implemented
SU0219 # 11 Y:2005 11 2005 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $53,360 $111,859 Not Implemented
SU0219 # 12 Y:2005 12 2005 ADD AREA LIGHTING SWITCHES $4,267 $10,645 Implemented
SU0219 # 13 Y:2005 13 2005 OPTIMIZE PLANT POWER FACTOR $2,894 $17,500 Not Implemented
LM0096 # 06 Y:2005 06 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $4,034 $90 Implemented
LM0096 # 09 Y:2005 09 2005 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $46,875 $2,000 Not Implemented
LM0096 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,099 $1,300 Implemented
LM0096 # 02 Y:2005 02 2005 UPGRADE CONTROLS ON COMPRESSORS $5,434 $350 Implemented
LM0096 # 03 Y:2005 03 2005 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $91,510 $125,000 Not Implemented
LM0096 # 04 Y:2005 04 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $364 $400 Implemented
LM0096 # 10 Y:2005 10 2005 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $3,250 $1,125 Not Implemented