Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
24
matching recommendationsSIC | 3676 | Electronic Resistors |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0480 # 07 Y:2019 | 07 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,439 | $20,587 | Implemented |
SU0480 # 05 Y:2019 | 05 | 2019 | INSTALL OCCUPANCY SENSORS | $1,917 | $2,919 | Implemented |
SU0480 # 04 Y:2019 | 04 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $922 | $899 | Implemented |
MI0221 # 06 Y:2012 | 06 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,479 | $1,075 | Implemented |
MI0221 # 04 Y:2012 | 04 | 2012 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,238 | $80 | Implemented |
MI0221 # 01 Y:2012 | 01 | 2012 | TURN OFF EQUIPMENT WHEN NOT IN USE | $10,726 | $1,800 | Implemented |
MI0221 # 02 Y:2012 | 02 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,561 | $1,660 | Implemented |
MI0221 # 03 Y:2012 | 03 | 2012 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $4,281 | $11,600 | Implemented |
UD0681 # 04 Y:2003 | 04 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,862 | $7,947 | Implemented |
UD0681 # 01 Y:2003 | 01 | 2003 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $82,000 | $1,490 | Implemented |
UD0681 # 07 Y:2003 | 07 | 2003 | AIR CONDITION ONLY SPACE NECESSARY | $1,800 | $0 | Implemented |
UD0681 # 08 Y:2003 | 08 | 2003 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $1,740 | $0 | Implemented |
UD0681 # 11 Y:2003 | 11 | 2003 | INSULATE BARE EQUIPMENT | $930 | $1,360 | Implemented |
UD0681 # 13 Y:2003 | 13 | 2003 | DISCONNECT BALLASTS | $159 | $46 | Implemented |
WI0298 # 01 Y:1997 | 01 | 1997 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $29,190 | $30,000 | Implemented |
WI0298 # 03 Y:1997 | 03 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,444 | $120 | Implemented |
WI0298 # 05 Y:1997 | 05 | 1997 | INSTALL AUTOMATIC PACKING EQUIPMENT | $24,000 | $20,000 | Implemented |
CO0208 # 07 Y:1991 | 07 | 1991 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $540 | $500 | Implemented |
CO0208 # 06 Y:1991 | 06 | 1991 | INSTALL TIMERS AND/OR THERMOSTATS | $800 | $1,500 | Implemented |
CO0208 # 05 Y:1991 | 05 | 1991 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $1,100 | $200 | Implemented |
CO0208 # 04 Y:1991 | 04 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $458 | $1,300 | Implemented |
CO0208 # 03 Y:1991 | 03 | 1991 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $300 | $892 | Implemented |
CO0208 # 02 Y:1991 | 02 | 1991 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $2,800 | $10,000 | Implemented |
CO0208 # 01 Y:1991 | 01 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,981 | $1,608 | Implemented |