IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

54

matching recommendations
Reset
SIC 3676 Electronic Resistors
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0681 # 07 Y:2003 07 2003 AIR CONDITION ONLY SPACE NECESSARY $1,800 $0 Implemented
UD0681 # 06 Y:2003 06 2003 REDUCE VENTILATION AIR $2,785 $1,360 Not Implemented
UD0681 # 14 Y:2003 14 2003 INSTALL OCCUPANCY SENSORS $105 $160 Not Implemented
UD0681 # 08 Y:2003 08 2003 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $1,740 $0 Implemented
UD0681 # 09 Y:2003 09 2003 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,095 $1,268 Not Implemented
UD0681 # 10 Y:2003 10 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,095 $91 Not Implemented
UD0681 # 11 Y:2003 11 2003 INSULATE BARE EQUIPMENT $930 $1,360 Implemented
UD0681 # 12 Y:2003 12 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $350 $230 Not Implemented
UD0681 # 13 Y:2003 13 2003 DISCONNECT BALLASTS $159 $46 Implemented
UD0681 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,862 $7,947 Implemented
UD0681 # 03 Y:2003 03 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $13,200 $8,060 Not Implemented
UD0681 # 02 Y:2003 02 2003 MAKE ICE DURING OFF PEAK HOURS FOR COOLING $26,822 $100,000 Not Implemented
UD0681 # 01 Y:2003 01 2003 $82,000 $1,490 Implemented
WI0298 # 01 Y:1997 01 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $29,190 $30,000 Implemented
WI0298 # 02 Y:1997 02 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,867 $1,480 Not Implemented
WI0298 # 03 Y:1997 03 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,444 $120 Implemented
WI0298 # 04 Y:1997 04 1997 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $25,193 $0 Not Implemented
WI0298 # 05 Y:1997 05 1997 $24,000 $20,000 Implemented
WI0298 # 09 Y:1997 09 1997 $140 $0 Not Implemented
WI0298 # 06 Y:1997 06 1997 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $3,119 $18,000 Not Implemented
WI0298 # 07 Y:1997 07 1997 MINIMIZE WATER USAGE $2,100 $1,000 Not Implemented
WI0298 # 08 Y:1997 08 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $686 $0 Not Implemented
CO0208 # 06 Y:1991 06 1991 INSTALL TIMERS AND/OR THERMOSTATS $800 $1,500 Implemented
CO0208 # 05 Y:1991 05 1991 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,100 $200 Implemented
CO0208 # 03 Y:1991 03 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $300 $892 Implemented