IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
Reset
SIC 3677 Electronic Coils And Transformers
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SJ0029 # 06 Y:2025 06 2025 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $10,952 $0 n/a
SJ0029 # 05 Y:2025 05 2025 INSULATE BARE EQUIPMENT $378 $574 n/a
SJ0029 # 04 Y:2025 04 2025 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,874 $6,782 n/a
SJ0029 # 03 Y:2025 03 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $78 $0 n/a
SJ0029 # 02 Y:2025 02 2025 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,400 $1,940 n/a
SJ0029 # 01 Y:2025 01 2025 USE SOLAR HEAT TO MAKE ELECTRICTY $137,645 $376,457 n/a
SD0544 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,529 $41,589 Implemented
SD0544 # 08 Y:2017 08 2017 USE WASTE HEAT STEAM FOR ABSORPTION REFRIGERATION $2,798 $7,832 Implemented
SD0544 # 07 Y:2017 07 2017 USE PHOTOCELL CONTROLS $3,481 $10,611 Implemented
SD0544 # 06 Y:2017 06 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,765 $3,500 Implemented
SD0544 # 05 Y:2017 05 2017 ISOLATE HOT OR COLD EQUIPMENT $5,008 $2,160 Not Implemented
SD0544 # 04 Y:2017 04 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,488 $8,800 Implemented
SD0544 # 03 Y:2017 03 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,835 $26,705 Implemented
SD0544 # 01 Y:2017 01 2017 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $23,627 $14,788 Not Implemented
LM0053 # 01 Y:2003 01 2003 INSTALL SPECTRAL REFLECTORS / DELAMP $1,027 $0 Not Implemented
LM0053 # 06 Y:2003 06 2003 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $37,911 $24,550 Not Implemented
LM0053 # 05 Y:2003 05 2003 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME $64,652 $4,768 Not Implemented
LM0053 # 04 Y:2003 04 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,585 $3,275 Not Implemented
LM0053 # 03 Y:2003 03 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $34 $0 Not Implemented
LM0053 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,855 $6,210 Not Implemented
SD0174 # 06 Y:1997 06 1997 USE A DIFFERENT OR RECYCLED RAW MATERIAL $2,397 $320 Not Implemented
SD0174 # 05 Y:1997 05 1997 CONVERT TO LESS TOXIC HYDROCARBON CLEANERS $4,145 $0 Implemented
SD0174 # 04 Y:1997 04 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,120 $2,000 Implemented
SD0174 # 03 Y:1997 03 1997 INSTALL SPECTRAL REFLECTORS / DELAMP $15,429 $16,085 Implemented
SD0174 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,934 $17,722 Implemented