IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

90

matching recommendations
Reset
SIC 3678 Electronic Connectors
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0361 # 08 Y:2019 08 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,145 $1,980 Implemented
MI0361 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,278 $17,214 Implemented
MI0361 # 03 Y:2019 03 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $17,548 $3,600 Implemented
MI0361 # 06 Y:2019 06 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,612 $160 Implemented
MI0361 # 01 Y:2019 01 2019 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $20,647 $100,030 Implemented
LE0475 # 05 Y:2019 05 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $50 $200 Implemented
LE0475 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,513 $12,830 Implemented
LE0475 # 01 Y:2019 01 2019 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $9,240 $0 Implemented
AS0465 # 04 Y:2019 04 2019 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $10,850 $17,634 Implemented
DL0123 # 01 Y:2014 01 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $1,760 $0 Implemented
DL0123 # 03 Y:2014 03 2014 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,740 $8,382 Implemented
DL0123 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,880 $547 Implemented
DL0123 # 05 Y:2014 05 2014 AIR CONDITION ONLY SPACE NECESSARY $1,250 $0 Implemented
DL0123 # 06 Y:2014 06 2014 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,900 $0 Implemented
DL0123 # 07 Y:2014 07 2014 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $990 $200 Implemented
DL0123 # 08 Y:2014 08 2014 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $350 $0 Implemented
DL0123 # 10 Y:2014 10 2014 INSTALL TIMERS AND/OR THERMOSTATS $1,560 $400 Implemented
DL0123 # 11 Y:2014 11 2014 USE RADIANT HEATER FOR SPOT HEATING $2,610 $2,610 Implemented
DL0123 # 12 Y:2014 12 2014 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $14,200 $0 Implemented
WV0476 # 05 Y:2013 05 2013 RECOVER WASTE HEAT FROM EQUIPMENT $845 $1,940 Implemented
WV0476 # 09 Y:2013 09 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $595 $1,431 Implemented
WV0476 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,046 $26,555 Implemented
WV0476 # 02 Y:2013 02 2013 INSTALL TIMERS AND/OR THERMOSTATS $13,346 $4,200 Implemented
WV0476 # 10 Y:2013 10 2013 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $301 $90 Implemented
WV0476 # 12 Y:2013 12 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $251 $50 Implemented