IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

35

matching recommendations
Reset
SIC 3679 Electronic Components, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1050 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,863 $0 Implemented
UD1050 # 06 Y:2023 06 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,940 $32,403 Implemented
UD1050 # 01 Y:2023 01 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,383 $0 Implemented
UD0779 # 11 Y:2008 11 2008 PAY BILLS ON TIME TO AVOID LATE FEES $4,322 $0 Implemented
UD0779 # 05 Y:2008 05 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $13,503 $3,318 Implemented
UD0779 # 04 Y:2008 04 2008 USE COUNTER-CURRENT RINSING TO REDUCE RINSE WATER VOLUME (GRAVURE) $13,555 $500 Implemented
UD0779 # 03 Y:2008 03 2008 REPLACE BOILER $17,736 $65,000 Implemented
UD0779 # 02 Y:2008 02 2008 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $95,648 $1,000 Implemented
UD0779 # 06 Y:2008 06 2008 IMPROVE COMBUSTION CONTROL CAPABILITY $75,942 $100,000 Implemented
UD0779 # 13 Y:2008 13 2008 INSULATE BARE EQUIPMENT $1,228 $100 Implemented
UD0779 # 12 Y:2008 12 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,658 $1,000 Implemented
UD0779 # 08 Y:2008 08 2008 INSULATE BARE EQUIPMENT $8,895 $412 Implemented
UD0779 # 14 Y:2008 14 2008 COVER OPEN TANKS $537 $360 Implemented
UD0624 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $980 $414 Implemented
UD0624 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,975 $13,704 Implemented
UD0508 # 08 Y:1996 08 1996 INSTALL AN UNINTERUPTABLE POWER SUPPLY $135,600 $222,868 Implemented
UD0508 # 10 Y:1996 10 1996 RECOVER AND REUSE COOLING WATER $5,108 $5,000 Implemented
UD0508 # 09 Y:1996 09 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,158 $2,286 Implemented
UD0508 # 07 Y:1996 07 1996 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $101,584 $40,000 Implemented
UD0508 # 06 Y:1996 06 1996 ELIMINATE/REDUCE AN OPERATION $8,523 $0 Implemented
UD0508 # 04 Y:1996 04 1996 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $31,719 $11,000 Implemented
UD0508 # 03 Y:1996 03 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,041 $8,081 Implemented
UD0508 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,088 $2,314 Implemented
UD0508 # 01 Y:1996 01 1996 OPTIMIZE PLANT POWER FACTOR $7,200 $60,000 Implemented
UD0467 # 02 Y:1995 02 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,434 $3,000 Implemented