IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

51

matching recommendations
Reset
SIC 3679 Electronic Components, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0226 # 06 Y:2001 06 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $279 $150 Not Implemented
NC0226 # 07 Y:2001 07 2001 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $23,668 $26,000 Not Implemented
NC0226 # 08 Y:2001 08 2001 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $93,403 $-312,000 Not Implemented
NC0181 # 05 Y:2000 05 2000 AIR CONDITION ONLY SPACE NECESSARY $14,765 $42,000 Not Implemented
NC0181 # 04 Y:2000 04 2000 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $5,692 $18,000 Not Implemented
NC0181 # 03 Y:2000 03 2000 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $18,564 $37,378 Not Implemented
NC0181 # 02 Y:2000 02 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $12,754 $65,000 Not Implemented
NC0181 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,376 $5,400 Not Implemented
TN0430 # 05 Y:1991 05 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,938 $2,450 Not Implemented
TN0430 # 08 Y:1991 08 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,412 $620 Not Implemented
TN0430 # 07 Y:1991 07 1991 USE WATER ON AIR CONDITIONING EXCHANGER TO IMPROVE HEAT TRANSFER AND INCREASE AIR CONDITIONER EFFICIENCY $1,477 $0 Not Implemented
TN0430 # 06 Y:1991 06 1991 INSTALL SET-BACK TIMERS $1,526 $0 Not Implemented
TN0430 # 13 Y:1991 13 1991 AIR CONDITION ONLY SPACE NECESSARY $427 $675 Not Implemented
TN0430 # 09 Y:1991 09 1991 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,462 $0 Not Implemented
TN0430 # 10 Y:1991 10 1991 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $1,165 $799 Not Implemented
TN0430 # 11 Y:1991 11 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,034 $3,340 Not Implemented
TN0430 # 12 Y:1991 12 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,839 $3,550 Not Implemented
TN0430 # 04 Y:1991 04 1991 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $8,321 $0 Not Implemented
TN0430 # 03 Y:1991 03 1991 SEPARATE CONTROLS OF AIR HANDLERS FROM AC/ HEATING SYSTEMS $13,212 $7,325 Not Implemented
TN0430 # 02 Y:1991 02 1991 INSULATE BARE EQUIPMENT $23,175 $2,472 Not Implemented
TN0430 # 01 Y:1991 01 1991 INSTALL TIMERS AND/OR THERMOSTATS $27,754 $8,700 Not Implemented
AT0044 # 05 Y:1986 05 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,115 $1,800 Implemented
AT0044 # 04 Y:1986 04 1986 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,618 $250 Not Implemented
AT0044 # 03 Y:1986 03 1986 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $1,314 $2,000 Not Implemented
AT0044 # 02 Y:1986 02 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,956 $300 Implemented