IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

70

matching recommendations
Reset
SIC 3679 Electronic Components, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0096 # 08 Y:1993 08 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $909 $500 Implemented
AS0096 # 09 Y:1993 09 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $792 $150 Not Implemented
AS0096 # 10 Y:1993 10 1993 RECOVER WASTE HEAT FROM EQUIPMENT $2,451 $4,000 Not Implemented
AS0096 # 11 Y:1993 11 1993 ISOLATE HOT OR COLD EQUIPMENT $1,577 $300 Implemented
AS0096 # 12 Y:1993 12 1993 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $178 $100 Implemented
AS0096 # 07 Y:1993 07 1993 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $516 $200 Not Implemented
AS0020 # 08 Y:1991 08 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,724 $500 Not Implemented
AS0020 # 01 Y:1991 01 1991 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $420,880 $0 Not Implemented
AS0020 # 02 Y:1991 02 1991 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,702 $2,000 Not Implemented
AS0020 # 03 Y:1991 03 1991 UTILIZE A LESS EXPENSIVE COOLING METHOD $9,652 $36,000 Not Implemented
AS0020 # 04 Y:1991 04 1991 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $14,804 $18,000 Not Implemented
AS0020 # 05 Y:1991 05 1991 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,073 $12,775 Not Implemented
AS0020 # 06 Y:1991 06 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,852 $2,168 Not Implemented
AS0020 # 07 Y:1991 07 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,293 $0 Not Implemented
AS0020 # 09 Y:1991 09 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,160 $1,000 Not Implemented
AS0020 # 10 Y:1991 10 1991 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $16,171 $0 Not Implemented
AS0020 # 11 Y:1991 11 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $193 $0 Not Implemented
AS0003 # 01 Y:1990 01 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,285 $1,622 Not Implemented
AS0003 # 03 Y:1990 03 1990 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $28,500 $7,500 Not Implemented
AS0003 # 02 Y:1990 02 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $897 $2,943 Implemented