Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,145
matching recommendationsSIC | 3679 | Electronic Components, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MU0036 # 08 Y:2023 | 08 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $305 | $1,240 | Not Implemented |
MU0036 # 07 Y:2023 | 07 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,370 | $0 | Implemented |
MU0036 # 06 Y:2023 | 06 | 2023 | INSTALL OCCUPANCY SENSORS | $1,296 | $30 | Not Implemented |
MU0036 # 05 Y:2023 | 05 | 2023 | USE PHOTOCELL CONTROLS | $756 | $0 | Implemented |
MU0036 # 04 Y:2023 | 04 | 2023 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,737 | $0 | Implemented |
MU0036 # 03 Y:2023 | 03 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $10,129 | $49,885 | Implemented |
MU0036 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $388 | $0 | Implemented |
MU0036 # 01 Y:2023 | 01 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,852 | $0 | Not Implemented |
SD0637 # 10 Y:2023 | 10 | 2023 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $25,625 | $49,475 | Not Implemented |
SD0637 # 09 Y:2023 | 09 | 2023 | INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM | $1,900 | $2,000 | Not Implemented |
SD0637 # 08 Y:2023 | 08 | 2023 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $1,662 | $0 | Implemented |
SD0637 # 07 Y:2023 | 07 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $788 | $1,660 | Not Implemented |
SD0637 # 06 Y:2023 | 06 | 2023 | USE BATTERY STORAGE FOR DEMAND CONTROL | $53,597 | $0 | Not Implemented |
SD0637 # 05 Y:2023 | 05 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $65,827 | $115,927 | Not Implemented |
SD0637 # 04 Y:2023 | 04 | 2023 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $6,593 | $8,642 | Not Implemented |
SD0637 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,393 | $700 | Implemented |
SD0637 # 02 Y:2023 | 02 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $665 | $2,159 | Not Implemented |
SD0637 # 01 Y:2023 | 01 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $283 | $250 | Implemented |
NT0007 # 05 Y:2023 | 05 | 2023 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $12,000 | $7,500 | Not Implemented |
NT0007 # 04 Y:2023 | 04 | 2023 | OPTIMIZE PLANT POWER FACTOR | $4,290 | $5,486 | Not Implemented |
NT0007 # 03 Y:2023 | 03 | 2023 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $22,470 | $0 | Not Implemented |
NT0007 # 02 Y:2023 | 02 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $63,856 | $337,512 | Not Implemented |
NT0007 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,184 | $5,993 | Implemented |
WM0201 # 05 Y:2023 | 05 | 2023 | INSTALL OCCUPANCY SENSORS | $1,042 | $195 | Not Implemented |
WM0201 # 04 Y:2023 | 04 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,077 | $1,814 | Not Implemented |