IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

70

matching recommendations
Reset
SIC 3679 Electronic Components, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0390 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,953 $23,750 Not Implemented
AS0390 # 04 Y:2004 04 2004 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $3,384 $15,950 Not Implemented
AS0390 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,783 $400 Implemented
AS0390 # 08 Y:2004 08 2004 INSTALL OCCUPANCY SENSORS $289 $450 Implemented
AS0390 # 01 Y:2004 01 2004 $11,500 $80 Implemented
AS0390 # 05 Y:2004 05 2004 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,779 $197 Implemented
AS0390 # 07 Y:2004 07 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,263 $30 Implemented
AS0390 # 06 Y:2004 06 2004 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,590 $230 Not Implemented
AS0295 # 02 Y:2001 02 2001 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,459 $10,800 Not Implemented
AS0295 # 05 Y:2001 05 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $152 $60 Not Implemented
AS0295 # 06 Y:2001 06 2001 $234,131 $140,869 Implemented
AS0295 # 03 Y:2001 03 2001 INSTALL OCCUPANCY SENSORS $433 $450 Not Implemented
AS0295 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,104 $5,107 Not Implemented
AS0295 # 04 Y:2001 04 2001 USE SYNTHETIC LUBRICANT $826 $694 Not Implemented
AS0228 # 02 Y:1998 02 1998 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $955,252 $4,000,000 Not Implemented
AS0228 # 06 Y:1998 06 1998 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $768 $60 Not Implemented
AS0228 # 03 Y:1998 03 1998 USE WASTE HEAT STEAM FOR ABSORPTION REFRIGERATION $395,073 $1,524,052 Not Implemented
AS0228 # 01 Y:1998 01 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $244,239 $410,200 Implemented
AS0228 # 04 Y:1998 04 1998 UTILIZE A LESS EXPENSIVE COOLING METHOD $17,372 $80,000 Not Implemented
AS0228 # 05 Y:1998 05 1998 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $69,699 $225,000 Not Implemented
AS0228 # 07 Y:1998 07 1998 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $12,819 $60 Not Implemented
AS0228 # 10 Y:1998 10 1998 $6,873 $3,125 Implemented
AS0228 # 08 Y:1998 08 1998 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $65,562 $7,000 Not Implemented
AS0228 # 09 Y:1998 09 1998 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $498,755 $240 Implemented
AS0228 # 11 Y:1998 11 1998 $11,311 $14,500 Not Implemented