Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
37
matching recommendationsSIC | 3679 | Electronic Components, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0546 # 02 Y:2004 | 02 | 2004 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $13,348 | $4,712 | n/a |
MA0546 # 01 Y:2004 | 01 | 2004 | INSTALL OCCUPANCY SENSORS | $16,130 | $4,480 | Not Implemented |
MA0546 # 06 Y:2004 | 06 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,243 | $3,230 | Implemented |
MA0546 # 08 Y:2004 | 08 | 2004 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $981 | $720 | Not Implemented |
MA0546 # 09 Y:2004 | 09 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $832 | $3,000 | Implemented |
MA0546 # 03 Y:2004 | 03 | 2004 | INSULATE BARE EQUIPMENT | $11,157 | $1,992 | Not Implemented |
MA0546 # 04 Y:2004 | 04 | 2004 | REDUCE VENTILATION AIR | $7,495 | $1,200 | Implemented |
MA0546 # 07 Y:2004 | 07 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,839 | $282 | Not Implemented |
MA0546 # 05 Y:2004 | 05 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,827 | $4,972 | Implemented |
MA0507 # 06 Y:2002 | 06 | 2002 | $576 | $0 | Implemented | |
MA0507 # 05 Y:2002 | 05 | 2002 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $795 | $3,230 | Implemented |
MA0507 # 04 Y:2002 | 04 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,037 | $35,500 | Not Implemented |
MA0507 # 03 Y:2002 | 03 | 2002 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $4,940 | $4,000 | Not Implemented |
MA0507 # 02 Y:2002 | 02 | 2002 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $12,237 | $40,000 | Not Implemented |
MA0507 # 01 Y:2002 | 01 | 2002 | $69,744 | $194,100 | Implemented | |
MA0507 # 07 Y:2002 | 07 | 2002 | USE POWER DURING OFF-PEAK PERIODS | $567 | $500 | Not Implemented |
MA0507 # 08 Y:2002 | 08 | 2002 | TURN OFF EQUIPMENT WHEN NOT IN USE | $213 | $0 | Implemented |
MA0368 # 02 Y:1996 | 02 | 1996 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $8,710 | $25,500 | Not Implemented |
MA0368 # 03 Y:1996 | 03 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,509 | $11,189 | Implemented |
MA0368 # 04 Y:1996 | 04 | 1996 | REPAIR OR REPLACE STEAM TRAPS | $1,990 | $868 | Implemented |
MA0368 # 05 Y:1996 | 05 | 1996 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $2,042 | $2,804 | Not Implemented |
MA0368 # 06 Y:1996 | 06 | 1996 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $285 | $460 | Implemented |
MA0368 # 01 Y:1996 | 01 | 1996 | TREAT AND REUSE RINSE WATERS | $17,190 | $12,000 | Not Implemented |
MA0100 # 03 Y:1987 | 03 | 1987 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,496 | $200 | Implemented |
MA0100 # 02 Y:1987 | 02 | 1987 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $6,571 | $19,480 | Not Implemented |