IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

37

matching recommendations
Reset
SIC 3679 Electronic Components, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0546 # 09 Y:2004 09 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $832 $3,000 Implemented
MA0546 # 01 Y:2004 01 2004 INSTALL OCCUPANCY SENSORS $16,130 $4,480 Not Implemented
MA0546 # 02 Y:2004 02 2004 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $13,348 $4,712 n/a
MA0546 # 03 Y:2004 03 2004 INSULATE BARE EQUIPMENT $11,157 $1,992 Not Implemented
MA0546 # 04 Y:2004 04 2004 REDUCE VENTILATION AIR $7,495 $1,200 Implemented
MA0546 # 05 Y:2004 05 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,827 $4,972 Implemented
MA0546 # 06 Y:2004 06 2004 RECOVER WASTE HEAT FROM EQUIPMENT $2,243 $3,230 Implemented
MA0546 # 07 Y:2004 07 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,839 $282 Not Implemented
MA0546 # 08 Y:2004 08 2004 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $981 $720 Not Implemented
MA0507 # 08 Y:2002 08 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $213 $0 Implemented
MA0507 # 07 Y:2002 07 2002 USE POWER DURING OFF-PEAK PERIODS $567 $500 Not Implemented
MA0507 # 06 Y:2002 06 2002 PAY BILLS ON TIME TO AVOID LATE FEES $576 $0 Implemented
MA0507 # 05 Y:2002 05 2002 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $795 $3,230 Implemented
MA0507 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,037 $35,500 Not Implemented
MA0507 # 03 Y:2002 03 2002 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $4,940 $4,000 Not Implemented
MA0507 # 02 Y:2002 02 2002 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $12,237 $40,000 Not Implemented
MA0507 # 01 Y:2002 01 2002 ADOPT IN-HOUSE MATERIAL GENERATION $69,744 $194,100 Implemented
MA0368 # 05 Y:1996 05 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,042 $2,804 Not Implemented
MA0368 # 06 Y:1996 06 1996 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $285 $460 Implemented
MA0368 # 04 Y:1996 04 1996 REPAIR OR REPLACE STEAM TRAPS $1,990 $868 Implemented
MA0368 # 03 Y:1996 03 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,509 $11,189 Implemented
MA0368 # 02 Y:1996 02 1996 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $8,710 $25,500 Not Implemented
MA0368 # 01 Y:1996 01 1996 TREAT AND REUSE RINSE WATERS $17,190 $12,000 Not Implemented
MA0100 # 03 Y:1987 03 1987 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,496 $200 Implemented
MA0100 # 02 Y:1987 02 1987 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $6,571 $19,480 Not Implemented