Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
21
matching recommendationsSIC | 3679 | Electronic Components, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0541 # 09 Y:2003 | 09 | 2003 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $523 | $72 | Not Implemented |
MA0541 # 08 Y:2003 | 08 | 2003 | INSULATE BARE EQUIPMENT | $635 | $260 | Implemented |
MA0541 # 07 Y:2003 | 07 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,751 | $0 | Not Implemented |
MA0541 # 06 Y:2003 | 06 | 2003 | USE MINIMUM STEAM OPERATING PRESSURE | $5,023 | $5,000 | Implemented |
MA0541 # 05 Y:2003 | 05 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,600 | $22,000 | n/a |
MA0541 # 04 Y:2003 | 04 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $12,264 | $5,500 | Implemented |
MA0541 # 03 Y:2003 | 03 | 2003 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $14,763 | $14,000 | Not Implemented |
MA0541 # 02 Y:2003 | 02 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $24,861 | $46,350 | Not Implemented |
MA0541 # 01 Y:2003 | 01 | 2003 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $89,343 | $700,000 | n/a |
MA0428 # 04 Y:1998 | 04 | 1998 | IMPROVE SPACE COMFORT CONDITIONING | $5,656 | $11,874 | Not Implemented |
MA0428 # 05 Y:1998 | 05 | 1998 | ADOPT IN-HOUSE MATERIAL GENERATION | $5,618 | $29,750 | Not Implemented |
MA0428 # 03 Y:1998 | 03 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,142 | $980 | Implemented |
MA0428 # 02 Y:1998 | 02 | 1998 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $642 | $30 | Implemented |
MA0428 # 01 Y:1998 | 01 | 1998 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $1,280 | $2,110 | Not Implemented |
MA0355 # 01 Y:1996 | 01 | 1996 | INSTALL SET-BACK TIMERS | $4,082 | $0 | Not Implemented |
MA0355 # 07 Y:1996 | 07 | 1996 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $62 | $102 | Not Implemented |
MA0355 # 06 Y:1996 | 06 | 1996 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $960 | $79 | Implemented |
MA0355 # 05 Y:1996 | 05 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,888 | $52,000 | Implemented |
MA0355 # 04 Y:1996 | 04 | 1996 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $5,576 | $24,000 | Not Implemented |
MA0355 # 03 Y:1996 | 03 | 1996 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $3,840 | $2,200 | Not Implemented |
MA0355 # 02 Y:1996 | 02 | 1996 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $4,520 | $2,700 | Implemented |