Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
31
matching recommendationsSIC | 3679 | Electronic Components, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0428 # 05 Y:1998 | 05 | 1998 | ADOPT IN-HOUSE MATERIAL GENERATION | $5,618 | $29,750 | Not Implemented |
MA0428 # 04 Y:1998 | 04 | 1998 | IMPROVE SPACE COMFORT CONDITIONING | $5,656 | $11,874 | Not Implemented |
MA0428 # 03 Y:1998 | 03 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,142 | $980 | Implemented |
MA0428 # 02 Y:1998 | 02 | 1998 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $642 | $30 | Implemented |
MA0428 # 01 Y:1998 | 01 | 1998 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $1,280 | $2,110 | Not Implemented |
OR0330 # 05 Y:1998 | 05 | 1998 | OPTIMIZE PLANT POWER FACTOR | $10,538 | $14,800 | Not Implemented |
OR0330 # 04 Y:1998 | 04 | 1998 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $163,740 | $125,000 | Not Implemented |
OR0330 # 03 Y:1998 | 03 | 1998 | TURN OFF EQUIPMENT WHEN NOT IN USE | $690 | $0 | Not Implemented |
OR0330 # 02 Y:1998 | 02 | 1998 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,900 | $0 | Implemented |
OR0330 # 01 Y:1998 | 01 | 1998 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $335,710 | $438,500 | Not Implemented |
CO0424 # 01 Y:1998 | 01 | 1998 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $9,580 | $1,000 | Not Implemented |
CO0424 # 02 Y:1998 | 02 | 1998 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $5,030 | $450 | Not Implemented |
AS0228 # 01 Y:1998 | 01 | 1998 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $244,239 | $410,200 | Implemented |
AS0228 # 11 Y:1998 | 11 | 1998 | INSTALL EQUIPMENT TO MOVE PRODUCT | $11,311 | $14,500 | Not Implemented |
AS0228 # 02 Y:1998 | 02 | 1998 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $955,252 | $4,000,000 | Not Implemented |
AS0228 # 03 Y:1998 | 03 | 1998 | USE WASTE HEAT STEAM FOR ABSORPTION REFRIGERATION | $395,073 | $1,524,052 | Not Implemented |
AS0228 # 04 Y:1998 | 04 | 1998 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $17,372 | $80,000 | Not Implemented |
AS0228 # 05 Y:1998 | 05 | 1998 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $69,699 | $225,000 | Not Implemented |
AS0228 # 06 Y:1998 | 06 | 1998 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $768 | $60 | Not Implemented |
AS0228 # 07 Y:1998 | 07 | 1998 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $12,819 | $60 | Not Implemented |
AS0228 # 08 Y:1998 | 08 | 1998 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $65,562 | $7,000 | Not Implemented |
AS0228 # 09 Y:1998 | 09 | 1998 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $498,755 | $240 | Implemented |
AS0228 # 10 Y:1998 | 10 | 1998 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $6,873 | $3,125 | Implemented |
ND0308 # 01 Y:1998 | 01 | 1998 | MINIMIZE WATER USAGE | $5,055 | $4,900 | Not Implemented |
ND0308 # 02 Y:1998 | 02 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,614 | $36,601 | Not Implemented |