IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

31

matching recommendations
Reset
SIC 3679 Electronic Components, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0428 # 05 Y:1998 05 1998 ADOPT IN-HOUSE MATERIAL GENERATION $5,618 $29,750 Not Implemented
MA0428 # 04 Y:1998 04 1998 IMPROVE SPACE COMFORT CONDITIONING $5,656 $11,874 Not Implemented
MA0428 # 03 Y:1998 03 1998 RECOVER WASTE HEAT FROM EQUIPMENT $3,142 $980 Implemented
MA0428 # 02 Y:1998 02 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $642 $30 Implemented
MA0428 # 01 Y:1998 01 1998 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $1,280 $2,110 Not Implemented
OR0330 # 05 Y:1998 05 1998 OPTIMIZE PLANT POWER FACTOR $10,538 $14,800 Not Implemented
OR0330 # 04 Y:1998 04 1998 UTILIZE A LESS EXPENSIVE COOLING METHOD $163,740 $125,000 Not Implemented
OR0330 # 03 Y:1998 03 1998 TURN OFF EQUIPMENT WHEN NOT IN USE $690 $0 Not Implemented
OR0330 # 02 Y:1998 02 1998 TURN OFF EQUIPMENT WHEN NOT IN USE $4,900 $0 Implemented
OR0330 # 01 Y:1998 01 1998 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $335,710 $438,500 Not Implemented
CO0424 # 01 Y:1998 01 1998 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $9,580 $1,000 Not Implemented
CO0424 # 02 Y:1998 02 1998 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $5,030 $450 Not Implemented
AS0228 # 01 Y:1998 01 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $244,239 $410,200 Implemented
AS0228 # 11 Y:1998 11 1998 INSTALL EQUIPMENT TO MOVE PRODUCT $11,311 $14,500 Not Implemented
AS0228 # 02 Y:1998 02 1998 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $955,252 $4,000,000 Not Implemented
AS0228 # 03 Y:1998 03 1998 USE WASTE HEAT STEAM FOR ABSORPTION REFRIGERATION $395,073 $1,524,052 Not Implemented
AS0228 # 04 Y:1998 04 1998 UTILIZE A LESS EXPENSIVE COOLING METHOD $17,372 $80,000 Not Implemented
AS0228 # 05 Y:1998 05 1998 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $69,699 $225,000 Not Implemented
AS0228 # 06 Y:1998 06 1998 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $768 $60 Not Implemented
AS0228 # 07 Y:1998 07 1998 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $12,819 $60 Not Implemented
AS0228 # 08 Y:1998 08 1998 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $65,562 $7,000 Not Implemented
AS0228 # 09 Y:1998 09 1998 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $498,755 $240 Implemented
AS0228 # 10 Y:1998 10 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $6,873 $3,125 Implemented
ND0308 # 01 Y:1998 01 1998 MINIMIZE WATER USAGE $5,055 $4,900 Not Implemented
ND0308 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,614 $36,601 Not Implemented