Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
34
matching recommendationsSIC | 369 | Misc. Electrical Equipment & Supplies |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0168 # 01 Y:1985 | 01 | 1985 | INSTALL TIMERS AND/OR THERMOSTATS | $2,947 | $125 | Implemented |
KU0152 # 03 Y:1985 | 03 | 1985 | USE OPTIMUM TEMPERATURE | $2,973 | $2,000 | Implemented |
KU0152 # 07 Y:1985 | 07 | 1985 | REDUCE VENTILATION AIR | $877 | $100 | Implemented |
KU0152 # 01 Y:1985 | 01 | 1985 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,790 | $1,100 | Implemented |
KU0152 # 13 Y:1985 | 13 | 1985 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $209 | $0 | Implemented |
KU0152 # 12 Y:1985 | 12 | 1985 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $189 | $20 | Implemented |
KU0152 # 04 Y:1985 | 04 | 1985 | INSTALL TIMERS AND/OR THERMOSTATS | $2,676 | $149 | Implemented |
KU0152 # 11 Y:1985 | 11 | 1985 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $233 | $14 | Implemented |
KU0152 # 08 Y:1985 | 08 | 1985 | INSTALL AUTOMATIC STACK DAMPER | $176 | $600 | Implemented |
KU0152 # 05 Y:1985 | 05 | 1985 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $859 | $0 | Implemented |
KU0152 # 09 Y:1985 | 09 | 1985 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $155 | $280 | Implemented |
KU0148 # 01 Y:1984 | 01 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,910 | $36 | Implemented |
KU0148 # 02 Y:1984 | 02 | 1984 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $2,754 | $3,000 | Implemented |
KU0148 # 03 Y:1984 | 03 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $514 | $800 | Implemented |
KU0148 # 04 Y:1984 | 04 | 1984 | INSTALL AUTOMATIC STACK DAMPER | $436 | $700 | Implemented |
KU0148 # 05 Y:1984 | 05 | 1984 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $366 | $100 | Implemented |
KU0148 # 09 Y:1984 | 09 | 1984 | REPLACE BROKEN WINDOWS AND/OR WINDOW SASH | $298 | $12 | Implemented |
KU0148 # 10 Y:1984 | 10 | 1984 | REDUCE VENTILATION AIR | $2,954 | $500 | Implemented |
KU0148 # 12 Y:1984 | 12 | 1984 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,177 | $17 | Implemented |
KU0148 # 13 Y:1984 | 13 | 1984 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,182 | $2,000 | Implemented |
KU0148 # 14 Y:1984 | 14 | 1984 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $760 | $0 | Implemented |
KU0108 # 05 Y:1983 | 05 | 1983 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $872 | $132 | Implemented |
KU0108 # 06 Y:1983 | 06 | 1983 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,351 | $6,314 | Implemented |
KU0108 # 07 Y:1983 | 07 | 1983 | REPLACE BROKEN WINDOWS AND/OR WINDOW SASH | $1,840 | $52 | Implemented |
KU0108 # 04 Y:1983 | 04 | 1983 | INSTALL TIMERS AND/OR THERMOSTATS | $1,414 | $400 | Implemented |