Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

989

matching recommendations
Reset
SIC 369 Misc. Electrical Equipment & Supplies
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0571 # 03 Y:2005 03 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,520 $5,600 Not Implemented
CO0571 # 04 Y:2005 04 2005 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,540 $3,240 Not Implemented
CO0571 # 05 Y:2005 05 2005 HEAT TREAT PARTS ONLY TO REQUIRED SPECIFICATIONS OR STANDARDS $770 $3,000 Not Implemented
CO0571 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,660 $37,360 Not Implemented
CO0571 # 07 Y:2005 07 2005 INSTALL TIMERS AND/OR THERMOSTATS $9,920 $6,000 Not Implemented
CO0571 # 08 Y:2005 08 2005 INSTALL SKYLIGHTS $6,230 $56,000 Not Implemented
CO0571 # 09 Y:2005 09 2005 USE SOLAR HEAT TO HEAT MAKE-UP AIR $1,540 $14,140 Not Implemented
CO0571 # 10 Y:2005 10 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,230 $1,000 Implemented
AM0446 # 01 Y:2003 01 2003 $10,000 $40,000 Implemented
AM0446 # 02 Y:2003 02 2003 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $7,310 $0 Not Implemented
AM0446 # 03 Y:2003 03 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,850 $0 Implemented
AM0446 # 04 Y:2003 04 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,060 $0 Not Implemented
AM0446 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,060 $500 Implemented
AM0446 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $760 $650 Not Implemented
AM0446 # 07 Y:2003 07 2003 $730 $250 Implemented
AM0446 # 08 Y:2003 08 2003 CHECK FOR ACCURACY OF UTILITY / POWER METERS $300 $0 Implemented
AM0446 # 09 Y:2003 09 2003 USE PHOTOCELL CONTROLS $140 $65 Not Implemented
SU0159 # 01 Y:2003 01 2003 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $5,869 $18,122 Not Implemented
SU0159 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,575 $15,750 Not Implemented
SU0159 # 03 Y:2003 03 2003 USE SYNTHETIC LUBRICANT $1,187 $800 Implemented
SU0159 # 04 Y:2003 04 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,171 $0 Implemented
SU0159 # 05 Y:2003 05 2003 REPLACE BOILER $1,148 $13,507 Implemented
SU0159 # 06 Y:2003 06 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,028 $0 Implemented
SU0159 # 07 Y:2003 07 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $276 $523 Implemented
AS0343 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,371 $20,633 Implemented