IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

983

matching recommendations
Reset
SIC 369 Misc. Electrical Equipment & Supplies
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0014 # 08 Y:2013 08 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $653 $1,081 Not Implemented
IP0012 # 01 Y:2013 01 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $21,525 $0 Implemented
IP0012 # 02 Y:2013 02 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $5,948 $0 Implemented
IP0012 # 03 Y:2013 03 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,627 $0 Implemented
IP0012 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,371 $0 Implemented
IP0012 # 05 Y:2013 05 2013 RECOVER WASTE HEAT FROM EQUIPMENT $1,316 $1,171 Implemented
IP0012 # 06 Y:2013 06 2013 INSTALL OCCUPANCY SENSORS $2,095 $4,480 Not Implemented
IP0012 # 07 Y:2013 07 2013 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $33,436 $104,600 Not Implemented
SF0426 # 01 Y:2013 01 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,719 $0 Not Implemented
SF0426 # 02 Y:2013 02 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $1,686 $0 Not Implemented
SF0426 # 03 Y:2013 03 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $8,403 $649 Not Implemented
SF0426 # 04 Y:2013 04 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,301 $7,526 Not Implemented
SF0426 # 05 Y:2013 05 2013 INSTALL OCCUPANCY SENSORS $373 $1,619 Not Implemented
SF0426 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,979 $17,191 Implemented
MZ0106 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $55,068 $26,420 Not Implemented
MZ0106 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,548 $31,400 Implemented
MZ0106 # 03 Y:2012 03 2012 INSTALL OCCUPANCY SENSORS $5,174 $1,750 Implemented
MZ0106 # 04 Y:2012 04 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $87,874 $6,500 Not Implemented
MZ0106 # 05 Y:2012 05 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $20,969 $3,000 Implemented
MZ0106 # 06 Y:2012 06 2012 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $7,267 $25,000 Implemented
MZ0106 # 07 Y:2012 07 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,893 $850 Implemented
MZ0106 # 08 Y:2012 08 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $18,537 $1,200 Not Implemented
MZ0106 # 09 Y:2012 09 2012 INSTALL OCCUPANCY SENSORS $88,236 $30,000 Not Implemented
UK1213 # 09 Y:2012 09 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $316 $327 Not Implemented
UK1213 # 01 Y:2012 01 2012 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $16,324 $0 Implemented