Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

57

matching recommendations
Reset
SIC 369 Misc. Electrical Equipment & Supplies
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0575 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,831 $290 Implemented
UF0575 # 05 Y:2022 05 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,361 $0 Implemented
UF0575 # 04 Y:2022 04 2022 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $5,193 $12,000 Not Implemented
UF0575 # 03 Y:2022 03 2022 USE DEMAND CONTROLLER OR LOAD SHEDDER $59,112 $64,054 Implemented
UF0575 # 02 Y:2022 02 2022 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $175,432 $0 Not Implemented
UF0575 # 01 Y:2022 01 2022 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $320,724 $1,068,750 Implemented
UF0575 # 07 Y:2022 07 2022 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $200,000 $0 Implemented
UF0536 # 07 Y:2019 07 2019 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $11,297 $3,028 Not Implemented
UF0536 # 06 Y:2019 06 2019 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $18,000 $18,548 Not Implemented
UF0536 # 05 Y:2019 05 2019 INSTALL AN UNINTERUPTABLE POWER SUPPLY $25,860 $33,265 Not Implemented
UF0536 # 04 Y:2019 04 2019 CLEAN CONDENSER TUBES $4,554 $4,248 Not Implemented
UF0536 # 03 Y:2019 03 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,433 $2,264 Not Implemented
UF0536 # 01 Y:2019 01 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $10,130 $557 Not Implemented
UF0536 # 02 Y:2019 02 2019 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $5,331 $25,000 Not Implemented
UF0430 # 02 Y:2010 02 2010 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,044 $0 Implemented
UF0430 # 06 Y:2010 06 2010 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $86,549 $4,000 Not Implemented
UF0430 # 08 Y:2010 08 2010 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $6,842 $0 Implemented
UF0430 # 04 Y:2010 04 2010 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,547 $0 Implemented
UF0430 # 07 Y:2010 07 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,016 $404 Implemented
UF0430 # 05 Y:2010 05 2010 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,211 $0 Not Implemented
UF0430 # 01 Y:2010 01 2010 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $28,959 $5,655 Implemented
UF0430 # 03 Y:2010 03 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,531 $0 Not Implemented
UF0311 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,935 $119,640 Not Implemented
UF0311 # 02 Y:2002 02 2002 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $20,300 $1,640 Implemented
UF0311 # 06 Y:2002 06 2002 RECYCLE FLUORESCENT LAMPS $10,412 $1,895 Not Implemented