Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
57
matching recommendationsSIC | 369 | Misc. Electrical Equipment & Supplies |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0575 # 06 Y:2022 | 06 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,831 | $290 | Implemented |
UF0575 # 05 Y:2022 | 05 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,361 | $0 | Implemented |
UF0575 # 04 Y:2022 | 04 | 2022 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $5,193 | $12,000 | Not Implemented |
UF0575 # 03 Y:2022 | 03 | 2022 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $59,112 | $64,054 | Implemented |
UF0575 # 02 Y:2022 | 02 | 2022 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $175,432 | $0 | Not Implemented |
UF0575 # 01 Y:2022 | 01 | 2022 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $320,724 | $1,068,750 | Implemented |
UF0575 # 07 Y:2022 | 07 | 2022 | LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS | $200,000 | $0 | Implemented |
UF0536 # 07 Y:2019 | 07 | 2019 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $11,297 | $3,028 | Not Implemented |
UF0536 # 06 Y:2019 | 06 | 2019 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $18,000 | $18,548 | Not Implemented |
UF0536 # 05 Y:2019 | 05 | 2019 | INSTALL AN UNINTERUPTABLE POWER SUPPLY | $25,860 | $33,265 | Not Implemented |
UF0536 # 04 Y:2019 | 04 | 2019 | CLEAN CONDENSER TUBES | $4,554 | $4,248 | Not Implemented |
UF0536 # 03 Y:2019 | 03 | 2019 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,433 | $2,264 | Not Implemented |
UF0536 # 01 Y:2019 | 01 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $10,130 | $557 | Not Implemented |
UF0536 # 02 Y:2019 | 02 | 2019 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $5,331 | $25,000 | Not Implemented |
UF0430 # 02 Y:2010 | 02 | 2010 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,044 | $0 | Implemented |
UF0430 # 06 Y:2010 | 06 | 2010 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $86,549 | $4,000 | Not Implemented |
UF0430 # 08 Y:2010 | 08 | 2010 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $6,842 | $0 | Implemented |
UF0430 # 04 Y:2010 | 04 | 2010 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $2,547 | $0 | Implemented |
UF0430 # 07 Y:2010 | 07 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,016 | $404 | Implemented |
UF0430 # 05 Y:2010 | 05 | 2010 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,211 | $0 | Not Implemented |
UF0430 # 01 Y:2010 | 01 | 2010 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $28,959 | $5,655 | Implemented |
UF0430 # 03 Y:2010 | 03 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,531 | $0 | Not Implemented |
UF0311 # 01 Y:2002 | 01 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $27,935 | $119,640 | Not Implemented |
UF0311 # 02 Y:2002 | 02 | 2002 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $20,300 | $1,640 | Implemented |
UF0311 # 06 Y:2002 | 06 | 2002 | RECYCLE FLUORESCENT LAMPS | $10,412 | $1,895 | Not Implemented |