Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

30

matching recommendations
Reset
SIC 369 Misc. Electrical Equipment & Supplies
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ME0278 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,953 $100 n/a
ME0278 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,390 $39,936 n/a
ME0278 # 12 Y:1999 12 1999 ELIMINATE LEAKS IN WATER LINES AND VALVES $250 $100 n/a
ME0278 # 11 Y:1999 11 1999 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $163 $0 n/a
ME0278 # 10 Y:1999 10 1999 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,892 $0 n/a
ME0278 # 09 Y:1999 09 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,522 $5,068 n/a
ME0278 # 08 Y:1999 08 1999 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,680 $3,920 n/a
ME0278 # 07 Y:1999 07 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,859 $100 n/a
ME0278 # 06 Y:1999 06 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $3,237 $9,562 n/a
ME0278 # 05 Y:1999 05 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,411 $2,247 n/a
ME0278 # 04 Y:1999 04 1999 PAY BILLS ON TIME TO AVOID LATE FEES $5,835 $0 n/a
ME0278 # 03 Y:1999 03 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,910 $450 n/a
ME0188 # 04 Y:1996 04 1996 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $13,452 $308 Implemented
ME0188 # 03 Y:1996 03 1996 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $26,743 $600 Implemented
ME0188 # 02 Y:1996 02 1996 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $40,938 $4,108 Not Implemented
ME0188 # 01 Y:1996 01 1996 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $58,152 $127,000 Not Implemented
ME0188 # 05 Y:1996 05 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,440 $18,689 Implemented
ME0188 # 06 Y:1996 06 1996 RECOVER WASTE HEAT FROM EQUIPMENT $1,521 $2,761 Implemented
ME0188 # 07 Y:1996 07 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $646 $1,118 Implemented
ME0188 # 08 Y:1996 08 1996 USE OPTIMUM TEMPERATURE $570 $530 Not Implemented
ME0154 # 07 Y:1995 07 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,118 $800 Not Implemented
ME0154 # 08 Y:1995 08 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,900 $400 Implemented
ME0154 # 06 Y:1995 06 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,537 $1,175 Implemented
ME0154 # 03 Y:1995 03 1995 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $5,200 $400 Not Implemented
ME0154 # 02 Y:1995 02 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,527 $1,500 Not Implemented