Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
30
matching recommendationsSIC | 369 | Misc. Electrical Equipment & Supplies |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
ME0278 # 02 Y:1999 | 02 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,953 | $100 | n/a |
ME0278 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,390 | $39,936 | n/a |
ME0278 # 12 Y:1999 | 12 | 1999 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $250 | $100 | n/a |
ME0278 # 11 Y:1999 | 11 | 1999 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $163 | $0 | n/a |
ME0278 # 10 Y:1999 | 10 | 1999 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $1,892 | $0 | n/a |
ME0278 # 09 Y:1999 | 09 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,522 | $5,068 | n/a |
ME0278 # 08 Y:1999 | 08 | 1999 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $2,680 | $3,920 | n/a |
ME0278 # 07 Y:1999 | 07 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,859 | $100 | n/a |
ME0278 # 06 Y:1999 | 06 | 1999 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $3,237 | $9,562 | n/a |
ME0278 # 05 Y:1999 | 05 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,411 | $2,247 | n/a |
ME0278 # 04 Y:1999 | 04 | 1999 | PAY BILLS ON TIME TO AVOID LATE FEES | $5,835 | $0 | n/a |
ME0278 # 03 Y:1999 | 03 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,910 | $450 | n/a |
ME0188 # 04 Y:1996 | 04 | 1996 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $13,452 | $308 | Implemented |
ME0188 # 03 Y:1996 | 03 | 1996 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $26,743 | $600 | Implemented |
ME0188 # 02 Y:1996 | 02 | 1996 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $40,938 | $4,108 | Not Implemented |
ME0188 # 01 Y:1996 | 01 | 1996 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $58,152 | $127,000 | Not Implemented |
ME0188 # 05 Y:1996 | 05 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,440 | $18,689 | Implemented |
ME0188 # 06 Y:1996 | 06 | 1996 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,521 | $2,761 | Implemented |
ME0188 # 07 Y:1996 | 07 | 1996 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $646 | $1,118 | Implemented |
ME0188 # 08 Y:1996 | 08 | 1996 | USE OPTIMUM TEMPERATURE | $570 | $530 | Not Implemented |
ME0154 # 07 Y:1995 | 07 | 1995 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,118 | $800 | Not Implemented |
ME0154 # 08 Y:1995 | 08 | 1995 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,900 | $400 | Implemented |
ME0154 # 06 Y:1995 | 06 | 1995 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $2,537 | $1,175 | Implemented |
ME0154 # 03 Y:1995 | 03 | 1995 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $5,200 | $400 | Not Implemented |
ME0154 # 02 Y:1995 | 02 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,527 | $1,500 | Not Implemented |