IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
SIC 369 Misc. Electrical Equipment & Supplies
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0687 # 05 Y:2017 05 2017 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $6,460 $16,124 Not Implemented
OR0687 # 04 Y:2017 04 2017 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $3,195 $5,650 Not Implemented
OR0687 # 03 Y:2017 03 2017 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $205,629 $340,000 Not Implemented
OR0687 # 02 Y:2017 02 2017 USE PHOTOCELL CONTROLS $2,967 $2,000 Not Implemented
OR0687 # 01 Y:2017 01 2017 ADJUST BURNERS FOR EFFICIENT OPERATION $2,090 $600 Not Implemented
OR0267 # 03 Y:1996 03 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $700 $1,000 Implemented
OR0267 # 02 Y:1996 02 1996 INSULATE BARE EQUIPMENT $2,200 $2,460 Not Implemented
OR0267 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,697 $0 Implemented
OR0267 # 04 Y:1996 04 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,347 $3,008 Implemented
OR0212 # 04 Y:1994 04 1994 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $69,996 $30,000 Implemented
OR0212 # 05 Y:1994 05 1994 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $51,397 $0 Not Implemented
OR0212 # 06 Y:1994 06 1994 OPTIMIZE PLANT POWER FACTOR $11,009 $45,344 Not Implemented
OR0212 # 07 Y:1994 07 1994 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE $153,000 $106,000 Implemented
OR0212 # 02 Y:1994 02 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,121 $1,763 Implemented
OR0212 # 01 Y:1994 01 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,043 $0 Not Implemented
OR0212 # 03 Y:1994 03 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,007 $12,425 Not Implemented
OR0026 # 01 Y:1988 01 1988 INSTALL SET-BACK TIMERS $1,607 $0 Not Implemented
OR0026 # 02 Y:1988 02 1988 INSTALL TIMERS AND/OR THERMOSTATS $28,590 $1,000 Implemented
OR0026 # 03 Y:1988 03 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $382 $100 Not Implemented
OR0026 # 04 Y:1988 04 1988 INSULATE BARE EQUIPMENT $2,666 $3,230 Implemented
OR0026 # 05 Y:1988 05 1988 RECOVER AND REUSE COOLING WATER $702 $2,050 Implemented
OR0002 # 01 Y:1987 01 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,190 $300 Implemented
OR0002 # 02 Y:1987 02 1987 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,568 $550 Not Implemented
OR0002 # 03 Y:1987 03 1987 MINIMIZE WATER USAGE $1,082 $300 Not Implemented
OR0002 # 04 Y:1987 04 1987 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,563 $4,730 Not Implemented