Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
28
matching recommendationsSIC | 3691 | Storage Batteries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0575 # 07 Y:2022 | 07 | 2022 | LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS | $200,000 | $0 | Implemented |
UF0575 # 06 Y:2022 | 06 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,831 | $290 | Implemented |
UF0575 # 05 Y:2022 | 05 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,361 | $0 | Implemented |
UF0575 # 04 Y:2022 | 04 | 2022 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $5,193 | $12,000 | Not Implemented |
UF0575 # 03 Y:2022 | 03 | 2022 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $59,112 | $64,054 | Implemented |
UF0575 # 02 Y:2022 | 02 | 2022 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $175,432 | $0 | Not Implemented |
UF0575 # 01 Y:2022 | 01 | 2022 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $320,724 | $1,068,750 | Implemented |
UF0536 # 01 Y:2019 | 01 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $10,130 | $557 | Not Implemented |
UF0536 # 07 Y:2019 | 07 | 2019 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $11,297 | $3,028 | Not Implemented |
UF0536 # 06 Y:2019 | 06 | 2019 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $18,000 | $18,548 | Not Implemented |
UF0536 # 05 Y:2019 | 05 | 2019 | INSTALL AN UNINTERUPTABLE POWER SUPPLY | $25,860 | $33,265 | Not Implemented |
UF0536 # 04 Y:2019 | 04 | 2019 | CLEAN CONDENSER TUBES | $4,554 | $4,248 | Not Implemented |
UF0536 # 03 Y:2019 | 03 | 2019 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,433 | $2,264 | Not Implemented |
UF0536 # 02 Y:2019 | 02 | 2019 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $5,331 | $25,000 | Not Implemented |
MI0022 # 01 Y:2001 | 01 | 2001 | METER WASTE WATER | $2,560 | $3,650 | Not Implemented |
MI0022 # 05 Y:2001 | 05 | 2001 | IMPROVE SPACE COMFORT CONDITIONING | $6,250 | $3,000 | Not Implemented |
MI0022 # 04 Y:2001 | 04 | 2001 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,817 | $56 | Not Implemented |
MI0022 # 03 Y:2001 | 03 | 2001 | INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE | $4,177 | $3,116 | Not Implemented |
MI0022 # 02 Y:2001 | 02 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,195 | $331 | Not Implemented |
UF0249 # 09 Y:2000 | 09 | 2000 | INSTALL BACK-UP EQUIPMENT | $449,439 | $2,100,000 | Not Implemented |
UF0249 # 08 Y:2000 | 08 | 2000 | OPTIMIZE PLANT POWER FACTOR | $7,881 | $9,000 | Not Implemented |
UF0249 # 07 Y:2000 | 07 | 2000 | REUSE / RECYCLE/ SELL RUBBER PRODUCTS | $2,400 | $0 | Not Implemented |
UF0249 # 06 Y:2000 | 06 | 2000 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $93,870 | $9,000 | Not Implemented |
UF0249 # 05 Y:2000 | 05 | 2000 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,678 | $4,886 | Implemented |
UF0249 # 04 Y:2000 | 04 | 2000 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $1,684,933 | $2,200,000 | Not Implemented |