IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
Reset
SIC 3691 Storage Batteries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0575 # 07 Y:2022 07 2022 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $200,000 $0 Implemented
UF0575 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,831 $290 Implemented
UF0575 # 05 Y:2022 05 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,361 $0 Implemented
UF0575 # 04 Y:2022 04 2022 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $5,193 $12,000 Not Implemented
UF0575 # 03 Y:2022 03 2022 USE DEMAND CONTROLLER OR LOAD SHEDDER $59,112 $64,054 Implemented
UF0575 # 02 Y:2022 02 2022 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $175,432 $0 Not Implemented
UF0575 # 01 Y:2022 01 2022 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $320,724 $1,068,750 Implemented
UF0536 # 01 Y:2019 01 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $10,130 $557 Not Implemented
UF0536 # 07 Y:2019 07 2019 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $11,297 $3,028 Not Implemented
UF0536 # 06 Y:2019 06 2019 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $18,000 $18,548 Not Implemented
UF0536 # 05 Y:2019 05 2019 INSTALL AN UNINTERUPTABLE POWER SUPPLY $25,860 $33,265 Not Implemented
UF0536 # 04 Y:2019 04 2019 CLEAN CONDENSER TUBES $4,554 $4,248 Not Implemented
UF0536 # 03 Y:2019 03 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,433 $2,264 Not Implemented
UF0536 # 02 Y:2019 02 2019 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $5,331 $25,000 Not Implemented
MI0022 # 01 Y:2001 01 2001 METER WASTE WATER $2,560 $3,650 Not Implemented
MI0022 # 05 Y:2001 05 2001 IMPROVE SPACE COMFORT CONDITIONING $6,250 $3,000 Not Implemented
MI0022 # 04 Y:2001 04 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,817 $56 Not Implemented
MI0022 # 03 Y:2001 03 2001 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE $4,177 $3,116 Not Implemented
MI0022 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,195 $331 Not Implemented
UF0249 # 09 Y:2000 09 2000 INSTALL BACK-UP EQUIPMENT $449,439 $2,100,000 Not Implemented
UF0249 # 08 Y:2000 08 2000 OPTIMIZE PLANT POWER FACTOR $7,881 $9,000 Not Implemented
UF0249 # 07 Y:2000 07 2000 REUSE / RECYCLE/ SELL RUBBER PRODUCTS $2,400 $0 Not Implemented
UF0249 # 06 Y:2000 06 2000 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $93,870 $9,000 Not Implemented
UF0249 # 05 Y:2000 05 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,678 $4,886 Implemented
UF0249 # 04 Y:2000 04 2000 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $1,684,933 $2,200,000 Not Implemented