Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,221
matching recommendationsSIC | 37 | Transportation Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0787 # 03 Y:2018 | 03 | 2018 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $4,796 | $100 | Implemented |
MA0787 # 04 Y:2018 | 04 | 2018 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $4,111 | $100 | Implemented |
MA0787 # 05 Y:2018 | 05 | 2018 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $660 | $100 | Implemented |
LS1802 # 01 Y:2018 | 01 | 2018 | TURN OFF EQUIPMENT WHEN NOT IN USE | $379 | $0 | Implemented |
LS1802 # 02 Y:2018 | 02 | 2018 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $1,300 | $200 | Implemented |
LS1802 # 04 Y:2018 | 04 | 2018 | USE PHOTOCELL CONTROLS | $427 | $400 | Implemented |
LS1802 # 05 Y:2018 | 05 | 2018 | INSTALL OCCUPANCY SENSORS | $159 | $550 | Implemented |
OR0698 # 02 Y:2018 | 02 | 2018 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $18,374 | $9,440 | Implemented |
OR0698 # 03 Y:2018 | 03 | 2018 | USE HEAT PUMP FOR SPACE CONDITIONING | $12,461 | $22,850 | Implemented |
OR0698 # 04 Y:2018 | 04 | 2018 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,148 | $325 | Implemented |
UA0187 # 03 Y:2017 | 03 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $38,219 | $6,260 | Implemented |
UA0187 # 05 Y:2017 | 05 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $48,032 | $136,663 | Implemented |
UA0187 # 06 Y:2017 | 06 | 2017 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $88,008 | $0 | Implemented |
MZ0241 # 01 Y:2017 | 01 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $326 | $0 | Implemented |
MZ0241 # 02 Y:2017 | 02 | 2017 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $1,238 | $3,570 | Implemented |
MZ0241 # 03 Y:2017 | 03 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,547 | $4,050 | Implemented |
MZ0241 # 04 Y:2017 | 04 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,218 | $1,820 | Implemented |
MZ0241 # 05 Y:2017 | 05 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $34,321 | $100,150 | Implemented |
MZ0241 # 06 Y:2017 | 06 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,151 | $4,125 | Implemented |
MZ0241 # 07 Y:2017 | 07 | 2017 | INSTALL OCCUPANCY SENSORS | $658 | $700 | Implemented |
MZ0241 # 10 Y:2017 | 10 | 2017 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $93,474 | $93,474 | Implemented |
TR0005 # 01 Y:2017 | 01 | 2017 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $4,452 | $6,500 | Implemented |
TR0005 # 03 Y:2017 | 03 | 2017 | CHANGE METHOD OF DEIONIZED WATER PRODUCTION | $258,000 | $292,000 | Implemented |
TR0005 # 04 Y:2017 | 04 | 2017 | METER WASTE WATER | $11,708 | $2,650 | Implemented |
TR0005 # 05 Y:2017 | 05 | 2017 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $15,338 | $56,000 | Implemented |