IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,221

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TA0105 # 02 Y:2005 02 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $2,356 $0 Implemented
TA0105 # 03 Y:2005 03 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $4,666 $0 Implemented
TA0105 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,400 $1,440 Implemented
LL0239 # 01 Y:2005 01 2005 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,454 $1,500 Implemented
LL0239 # 02 Y:2005 02 2005 USE PHOTOCELL CONTROLS $767 $150 Implemented
LL0239 # 03 Y:2005 03 2005 COMBINE UTILITY METERS $600 $0 Implemented
LL0239 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,083 $700 Implemented
LL0239 # 06 Y:2005 06 2005 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $41,500 $100 Implemented
MS0283 # 03 Y:2005 03 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,008 $50,375 Implemented
MS0283 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,338 $247 Implemented
IA0374 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,833 $839 Implemented
IA0374 # 03 Y:2005 03 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,536 $121 Implemented
IA0374 # 05 Y:2005 05 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $788 $168 Implemented
IA0374 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $822 $5 Implemented
IA0374 # 08 Y:2005 08 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $733 $1 Implemented
IA0374 # 09 Y:2005 09 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $233 $548 Implemented
IA0374 # 11 Y:2005 11 2005 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $16,269 $67 Implemented
OR0488 # 01 Y:2005 01 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $600 $200 Implemented
OR0488 # 03 Y:2005 03 2005 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $28,100 $132,000 Implemented
UM0289 # 01 Y:2005 01 2005 RECOVER WASTE HEAT FROM EQUIPMENT $164,291 $74,114 Implemented
UM0289 # 03 Y:2005 03 2005 INSTALL / REPAIR INSULATION ON STEAM LINES $37,184 $11,610 Implemented
UM0289 # 04 Y:2005 04 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $16,576 $2,500 Implemented
UM0289 # 05 Y:2005 05 2005 REPAIR AND ELIMINATE STEAM LEAKS $9,600 $1,400 Implemented
UM0288 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,386 $10,000 Implemented
UM0288 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,865 $150 Implemented