Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
471
matching recommendationsSIC | 37 | Transportation Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BD0311 # 01 Y:2006 | 01 | 2006 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $135,621 | $15,000 | Not Implemented |
BD0311 # 02 Y:2006 | 02 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,869 | $19,000 | Not Implemented |
BD0311 # 03 Y:2006 | 03 | 2006 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $30,440 | $51,950 | Not Implemented |
BD0311 # 04 Y:2006 | 04 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,646 | $0 | Not Implemented |
BD0311 # 05 Y:2006 | 05 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,867 | $10,230 | Not Implemented |
BD0311 # 06 Y:2006 | 06 | 2006 | INSTALL OCCUPANCY SENSORS | $543 | $375 | Not Implemented |
BD0311 # 07 Y:2006 | 07 | 2006 | INSTALL REDUNDANT EQUIPMENT TO AVOID LOSSES CAUSED BY EQUIPMENT FAILURE AND ROUTINE MAINTENANCE | $6,600 | $610 | Not Implemented |
BD0311 # 08 Y:2006 | 08 | 2006 | USE EVAPORATION TO CONCENTRATE MATERIAL | $4,860 | $8,000 | Not Implemented |
BD0311 # 09 Y:2006 | 09 | 2006 | MINIMIZE WATER USAGE | $656 | $3,220 | Not Implemented |
UD0710 # 01 Y:2005 | 01 | 2005 | INSTALL EQUIPMENT TO MOVE PRODUCT | $215,424 | $120,000 | Implemented |
UD0710 # 02 Y:2005 | 02 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $29,746 | $56,952 | Implemented |
UD0710 # 03 Y:2005 | 03 | 2005 | OPTIMIZE PLANT POWER FACTOR | $8,824 | $9,000 | Not Implemented |
UD0710 # 04 Y:2005 | 04 | 2005 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $3,908 | $2,080 | Not Implemented |
UD0710 # 05 Y:2005 | 05 | 2005 | UPGRADE CONTROLS ON COMPRESSORS | $3,385 | $0 | Not Implemented |
UD0710 # 06 Y:2005 | 06 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,911 | $500 | Not Implemented |
UD0710 # 07 Y:2005 | 07 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,172 | $2,964 | Implemented |
UD0710 # 08 Y:2005 | 08 | 2005 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $717 | $0 | Implemented |
UM0270 # 01 Y:2004 | 01 | 2004 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $46,210 | $29,000 | Not Implemented |
UM0270 # 02 Y:2004 | 02 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,116 | $18,242 | Not Implemented |
UM0270 # 03 Y:2004 | 03 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,108 | $11,108 | Implemented |
UM0270 # 04 Y:2004 | 04 | 2004 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $4,376 | $1,200 | Not Implemented |
UM0270 # 05 Y:2004 | 05 | 2004 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $196 | $400 | Implemented |
ND0347 # 01 Y:2000 | 01 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $125 | $100 | Implemented |
ND0347 # 02 Y:2000 | 02 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,121 | $6,762 | Not Implemented |
ND0347 # 03 Y:2000 | 03 | 2000 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $13,997 | $11,000 | Implemented |