IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

471

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0311 # 01 Y:2006 01 2006 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $135,621 $15,000 Not Implemented
BD0311 # 02 Y:2006 02 2006 RECOVER WASTE HEAT FROM EQUIPMENT $6,869 $19,000 Not Implemented
BD0311 # 03 Y:2006 03 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $30,440 $51,950 Not Implemented
BD0311 # 04 Y:2006 04 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,646 $0 Not Implemented
BD0311 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,867 $10,230 Not Implemented
BD0311 # 06 Y:2006 06 2006 INSTALL OCCUPANCY SENSORS $543 $375 Not Implemented
BD0311 # 07 Y:2006 07 2006 INSTALL REDUNDANT EQUIPMENT TO AVOID LOSSES CAUSED BY EQUIPMENT FAILURE AND ROUTINE MAINTENANCE $6,600 $610 Not Implemented
BD0311 # 08 Y:2006 08 2006 USE EVAPORATION TO CONCENTRATE MATERIAL $4,860 $8,000 Not Implemented
BD0311 # 09 Y:2006 09 2006 MINIMIZE WATER USAGE $656 $3,220 Not Implemented
UD0710 # 01 Y:2005 01 2005 INSTALL EQUIPMENT TO MOVE PRODUCT $215,424 $120,000 Implemented
UD0710 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,746 $56,952 Implemented
UD0710 # 03 Y:2005 03 2005 OPTIMIZE PLANT POWER FACTOR $8,824 $9,000 Not Implemented
UD0710 # 04 Y:2005 04 2005 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $3,908 $2,080 Not Implemented
UD0710 # 05 Y:2005 05 2005 UPGRADE CONTROLS ON COMPRESSORS $3,385 $0 Not Implemented
UD0710 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,911 $500 Not Implemented
UD0710 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,172 $2,964 Implemented
UD0710 # 08 Y:2005 08 2005 CHECK FOR ACCURACY OF UTILITY / POWER METERS $717 $0 Implemented
UM0270 # 01 Y:2004 01 2004 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $46,210 $29,000 Not Implemented
UM0270 # 02 Y:2004 02 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,116 $18,242 Not Implemented
UM0270 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,108 $11,108 Implemented
UM0270 # 04 Y:2004 04 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,376 $1,200 Not Implemented
UM0270 # 05 Y:2004 05 2004 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $196 $400 Implemented
ND0347 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $125 $100 Implemented
ND0347 # 02 Y:2000 02 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,121 $6,762 Not Implemented
ND0347 # 03 Y:2000 03 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $13,997 $11,000 Implemented