IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,523

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0885 # 02 Y:2014 02 2014 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $42,502 $2,889 Implemented
OK0885 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,111 $1,900 Implemented
OK0887 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $36,397 $35,374 Implemented
OK0887 # 02 Y:2014 02 2014 INSTALL OCCUPANCY SENSORS $7,219 $3,969 Implemented
OK0887 # 03 Y:2014 03 2014 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $8,717 $3,613 Implemented
OK0887 # 04 Y:2014 04 2014 INSTALL OCCUPANCY SENSORS $1,814 $8,926 Implemented
OK0887 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,474 $11,975 Implemented
OK0887 # 06 Y:2014 06 2014 INSTALL TIMERS AND/OR THERMOSTATS $13,990 $0 Implemented
OK0887 # 07 Y:2014 07 2014 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,993 $0 Implemented
UM0448 # 01 Y:2014 01 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $49,995 $61,425 Not Implemented
UM0448 # 02 Y:2014 02 2014 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $11,310 $500 Implemented
UM0448 # 03 Y:2014 03 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,336 $2,500 Implemented
UM0448 # 04 Y:2014 04 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,564 $500 Not Implemented
UM0448 # 05 Y:2014 05 2014 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $7,545 $4,750 Not Implemented
UM0447 # 01 Y:2014 01 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $32,946 $5,000 Implemented
UM0447 # 02 Y:2014 02 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $27,617 $28,500 Not Implemented
UM0447 # 03 Y:2014 03 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,058 $2,500 Implemented
UM0447 # 04 Y:2014 04 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,906 $1,000 Implemented
UM0447 # 05 Y:2014 05 2014 REPLACE BOILER $33,249 $3,000 Not Implemented
OR0630 # 01 Y:2014 01 2014 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $4,792 $500 Implemented
OR0630 # 02 Y:2014 02 2014 ADJUST BURNERS FOR EFFICIENT OPERATION $1,503 $1,500 Implemented
OR0630 # 03 Y:2014 03 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,588 $175,982 Implemented
OR0630 # 04 Y:2014 04 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,626 $500 Implemented
OR0630 # 05 Y:2014 05 2014 RECOVER WASTE HEAT FROM EQUIPMENT $1,074 $6,924 Not Implemented
WV0490 # 01 Y:2014 01 2014 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $10,882 $5,000 Implemented