IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,523

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0890 # 02 Y:2013 02 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,847 $0 Not Implemented
UD0890 # 03 Y:2013 03 2013 CHECK FOR ACCURACY OF UTILITY / POWER METERS $37,340 $0 Implemented
UD0890 # 04 Y:2013 04 2013 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $136,711 $0 Implemented
UD0890 # 05 Y:2013 05 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,587 $19,427 Not Implemented
UD0890 # 06 Y:2013 06 2013 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $5,216 $0 Implemented
UD0890 # 07 Y:2013 07 2013 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $37,438 $6,000 Implemented
UD0890 # 08 Y:2013 08 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,203 $0 Implemented
UD0890 # 09 Y:2013 09 2013 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $176,886 $101,000 Not Implemented
UD0890 # 10 Y:2013 10 2013 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $746,973 $100,000 Not Implemented
UD0890 # 11 Y:2013 11 2013 USE RADIANT HEATER FOR SPOT HEATING $565,879 $1,157,500 Not Implemented
UD0890 # 12 Y:2013 12 2013 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $19,159 $0 Not Implemented
BS0022 # 01 Y:2013 01 2013 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $3,444 $500 Implemented
BS0022 # 02 Y:2013 02 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,989 $218 Implemented
BS0022 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,022 $26,934 Not Implemented
BS0022 # 04 Y:2013 04 2013 COVER OPEN TANKS $418 $310 Not Implemented
BS0022 # 05 Y:2013 05 2013 REPAIR AND ELIMINATE STEAM LEAKS $1,748 $697 Implemented
BS0022 # 06 Y:2013 06 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $871 $15 Implemented
WM0030 # 01 Y:2013 01 2013 RECOVER WASTE HEAT FROM EQUIPMENT $1,439 $1,853 Not Implemented
WM0030 # 02 Y:2013 02 2013 USE RADIANT HEATER FOR SPOT HEATING $17,111 $9,180 Not Implemented
WM0030 # 03 Y:2013 03 2013 USE PHOTOCELL CONTROLS $2,234 $4,550 Not Implemented
WM0030 # 04 Y:2013 04 2013 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,570 $500 Not Implemented
WM0030 # 05 Y:2013 05 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,064 $0 Not Implemented
WM0030 # 06 Y:2013 06 2013 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $34,398 $69,000 Implemented
WM0030 # 07 Y:2013 07 2013 MODIFY STARTUP/SHUTDOWN TIMES $3,034 $0 Not Implemented
WM0030 # 08 Y:2013 08 2013 INSTALL OCCUPANCY SENSORS $473 $546 Not Implemented