IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,523

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0802 # 03 Y:2010 03 2010 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,477 $2,599 Not Implemented
OK0802 # 04 Y:2010 04 2010 INSTALL OCCUPANCY SENSORS $1,998 $13,149 Implemented
OK0802 # 05 Y:2010 05 2010 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $11,414 $51,875 Implemented
OK0802 # 06 Y:2010 06 2010 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $10,918 $2,775 Implemented
OK0802 # 07 Y:2010 07 2010 USE DEMAND CONTROLLER OR LOAD SHEDDER $30,411 $45,000 Implemented
OK0802 # 08 Y:2010 08 2010 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $23,800 $15,600 Implemented
OK0802 # 09 Y:2010 09 2010 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $11,625 $0 Implemented
OK0802 # 10 Y:2010 10 2010 COMBINE UTILITY METERS $936 $175 Implemented
OK0801 # 01 Y:2010 01 2010 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $6,511 $78,169 Implemented
OK0801 # 02 Y:2010 02 2010 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,599 $34,948 Implemented
OK0801 # 03 Y:2010 03 2010 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $9,699 $3,000 Implemented
OK0801 # 04 Y:2010 04 2010 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $995 $2,625 Implemented
OK0801 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,205 $660 Not Implemented
OK0801 # 06 Y:2010 06 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $523 $516 Not Implemented
OK0801 # 07 Y:2010 07 2010 RECOVER WASTE HEAT FROM EQUIPMENT $3,015 $2,017 Not Implemented
OK0801 # 08 Y:2010 08 2010 INSTALL OCCUPANCY SENSORS $547 $1,658 Not Implemented
OK0801 # 09 Y:2010 09 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $299 $201 Not Implemented
OK0801 # 10 Y:2010 10 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,069 $14,336 Not Implemented
OK0801 # 11 Y:2010 11 2010 OPTIMIZE PLANT POWER FACTOR $669 $9,307 Not Implemented
OK0801 # 12 Y:2010 12 2010 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $4,196 $21,075 Implemented
UA3005 # 01 Y:2010 01 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $30,246 $34,285 Not Implemented
UA3005 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,085 $42,861 Implemented
UA3005 # 03 Y:2010 03 2010 INSTALL OCCUPANCY SENSORS $2,974 $730 Not Implemented
UA3005 # 04 Y:2010 04 2010 UPGRADE CONTROLS ON COMPRESSORS $9,502 $20,000 Implemented
UA3005 # 05 Y:2010 05 2010 RECOVER WASTE HEAT FROM EQUIPMENT $9,061 $5,448 Not Implemented