IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,523

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0181 # 06 Y:2000 06 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $950 $200 Implemented
WV0181 # 07 Y:2000 07 2000 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $9,846 $10,000 Implemented
WV0181 # 08 Y:2000 08 2000 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,824 $350 Implemented
WV0181 # 09 Y:2000 09 2000 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $5,209 $11,000 Not Implemented
WV0181 # 10 Y:2000 10 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $15,000 $1,500 Not Implemented
TN0675 # 01 Y:2000 01 2000 DEVELOP A REPAIR/REPLACE POLICY $72,335 $1,075 Not Implemented
TN0675 # 02 Y:2000 02 2000 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $20,125 $25,600 Not Implemented
TN0675 # 03 Y:2000 03 2000 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME $18,800 $16,000 Implemented
TN0675 # 04 Y:2000 04 2000 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $9,789 $16,600 Implemented
TN0675 # 05 Y:2000 05 2000 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $8,725 $6,000 Implemented
TN0675 # 06 Y:2000 06 2000 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $2,450 $3,300 Implemented
TN0675 # 07 Y:2000 07 2000 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,844 $0 Not Implemented
MS0151 # 01 Y:2000 01 2000 OPTIMIZE PLANT POWER FACTOR $20,769 $17,100 Not Implemented
MS0151 # 02 Y:2000 02 2000 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $4,446 $100 Not Implemented
MS0151 # 03 Y:2000 03 2000 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,122 $4,900 Not Implemented
MS0151 # 04 Y:2000 04 2000 USE EVAPORATION TO CONCENTRATE MATERIAL $42,063 $39,781 Not Implemented
MS0151 # 05 Y:2000 05 2000 PAY BILLS ON TIME TO AVOID LATE FEES $17,092 $100 Not Implemented
UL0230 # 01 Y:1999 01 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,394 $40 Implemented
UL0230 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,353 $500 Implemented
UL0230 # 03 Y:1999 03 1999 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,860 $0 Not Implemented
UL0230 # 04 Y:1999 04 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $1,447 $0 Not Implemented
UL0230 # 05 Y:1999 05 1999 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $297,462 $167,000 Not Implemented
UL0230 # 06 Y:1999 06 1999 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $83,800 $80,000 Implemented
UL0230 # 07 Y:1999 07 1999 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $1,500 $0 Implemented
UL0230 # 08 Y:1999 08 1999 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $2,893 $2,120 Implemented