IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,504

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0171 # 09 Y:2023 09 2023 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $128 $600 Not Implemented
KS2315 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,991 $5,960 Implemented
KS2315 # 02 Y:2023 02 2023 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $33,086 $235,752 Implemented
KS2315 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,175 $24,588 Implemented
KS2315 # 04 Y:2023 04 2023 INSTALL OCCUPANCY SENSORS $4,028 $6,350 Implemented
KS2315 # 05 Y:2023 05 2023 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $545 $1,958 Not Implemented
KS2315 # 06 Y:2023 06 2023 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $39,181 $254,691 Not Implemented
KS2315 # 07 Y:2023 07 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $57,874 $421,464 Not Implemented
SF0597 # 01 Y:2023 01 2023 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,268 $0 Implemented
SF0597 # 02 Y:2023 02 2023 ADD AREA LIGHTING SWITCHES $11,388 $100 Implemented
SF0597 # 03 Y:2023 03 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $53,882 $13,192 Implemented
SF0597 # 04 Y:2023 04 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $706 $200 Not Implemented
SF0597 # 05 Y:2023 05 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $322,164 $2,251,041 Implemented
NT0001 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,144 $5,801 Implemented
NT0001 # 02 Y:2023 02 2023 UPGRADE CONTROLS ON COMPRESSORS $16,452 $9,984 Implemented
NT0001 # 03 Y:2023 03 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,130 $1,258 Implemented
NT0001 # 04 Y:2023 04 2023 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $19,448 $9,020 Not Implemented
NT0001 # 05 Y:2023 05 2023 INSTALL SET-BACK TIMERS $883 $0 Implemented
NT0001 # 06 Y:2023 06 2023 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $2,710 $0 Implemented
NT0001 # 07 Y:2023 07 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,707 $6,472 Implemented
TT0293 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,707 $1,500 Implemented
TT0293 # 02 Y:2023 02 2023 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $10,120 $0 Implemented
TT0293 # 03 Y:2023 03 2023 UPGRADE CONTROLS ON COMPRESSORS $7,910 $600 Implemented
TT0293 # 04 Y:2023 04 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,615 $31,320 Implemented
TT0293 # 05 Y:2023 05 2023 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $3,025 $10,040 Not Implemented