IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,523

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0139 # 09 Y:1999 09 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $70,000 $50,000 Implemented
SD0221 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,177 $3,752 Implemented
SD0221 # 02 Y:1999 02 1999 INSTALL SPECTRAL REFLECTORS / DELAMP $3,218 $3,060 Not Implemented
SD0221 # 03 Y:1999 03 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $50,303 $11,995 Not Implemented
SD0221 # 04 Y:1999 04 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,107 $0 Implemented
SD0221 # 05 Y:1999 05 1999 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,560 $1,560 Implemented
SD0221 # 06 Y:1999 06 1999 CONVERT TO AQUEOUS CLEANING SYSTEM $1,922 $1,922 Implemented
SD0221 # 07 Y:1999 07 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,002 $0 Implemented
TN0657 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,885 $13,800 Implemented
TN0657 # 02 Y:1999 02 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $320 $805 Implemented
TN0657 # 03 Y:1999 03 1999 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $64,750 $890 Implemented
TN0657 # 04 Y:1999 04 1999 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $2,000 $0 Implemented
TN0657 # 05 Y:1999 05 1999 ADD ADDITIONAL PRODUCTION SHIFT $110,000 $61,600 Implemented
OR0339 # 01 Y:1999 01 1999 MOVE PRODUCT USING MECHANICAL MEANS $5,106,400 $556,000 Not Implemented
OR0339 # 02 Y:1999 02 1999 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $6,650 $24,750 Implemented
OR0339 # 03 Y:1999 03 1999 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $3,080 $13,800 Implemented
OR0339 # 04 Y:1999 04 1999 TURN OFF EQUIPMENT WHEN NOT IN USE $178 $0 Not Implemented
OR0339 # 05 Y:1999 05 1999 RECOVER WASTE HEAT FROM EQUIPMENT $730 $381 Not Implemented
OR0339 # 06 Y:1999 06 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $254 $1,000 Implemented
OR0339 # 07 Y:1999 07 1999 UPGRADE CONTROLS ON COMPRESSORS $1,508 $1,454 Implemented
OR0339 # 08 Y:1999 08 1999 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $467 $441 Not Implemented
WV0161 # 01 Y:1999 01 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $199 $250 Not Implemented
WV0161 # 02 Y:1999 02 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $619 $160 Implemented
WV0161 # 03 Y:1999 03 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,368 $15 Implemented
WV0161 # 04 Y:1999 04 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,060 $15 Implemented