IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,523

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0235 # 07 Y:1998 07 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $163 $521 Not Implemented
AS0235 # 08 Y:1998 08 1998 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $45,000 $47,960 Not Implemented
OK0557 # 01 Y:1998 01 1998 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $956 $2,140 Implemented
OK0557 # 02 Y:1998 02 1998 USE POWER DURING OFF-PEAK PERIODS $15,633 $0 Implemented
OK0557 # 03 Y:1998 03 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $715 $250 Implemented
OK0557 # 04 Y:1998 04 1998 PAY UTILITY BILLS ON TIME $656 $0 Implemented
OK0557 # 05 Y:1998 05 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $20,969 $50,000 Implemented
OK0557 # 06 Y:1998 06 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $41,600 $260,000 Not Implemented
AR0149 # 01 Y:1998 01 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $605 $140 Implemented
AR0149 # 02 Y:1998 02 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,237 $360 Implemented
AR0149 # 03 Y:1998 03 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $576 $538 Implemented
AR0149 # 04 Y:1998 04 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,280 $240 Implemented
AR0149 # 05 Y:1998 05 1998 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $5,476 $8,000 Not Implemented
AR0149 # 06 Y:1998 06 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $5,836 $500 Not Implemented
AR0149 # 07 Y:1998 07 1998 INCREASE USE OF AUTOMATION $29,466 $15,000 Not Implemented
AR0149 # 08 Y:1998 08 1998 INCREASE USE OF AUTOMATION $76,050 $215,000 Not Implemented
IA0208 # 01 Y:1998 01 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,845 $495 Implemented
IA0208 # 02 Y:1998 02 1998 TURN OFF EQUIPMENT WHEN NOT IN USE $4,757 $0 Implemented
IA0208 # 03 Y:1998 03 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,597 $50 Implemented
IA0208 # 04 Y:1998 04 1998 INSTALL OCCUPANCY SENSORS $1,092 $1,250 Not Implemented
IA0208 # 05 Y:1998 05 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $187 $434 Implemented
IA0208 # 06 Y:1998 06 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $47 $92 Implemented
IA0208 # 07 Y:1998 07 1998 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $74,010 $2,000 Implemented
IA0208 # 08 Y:1998 08 1998 REDUCE OR ELIMINATE WASTE $159,120 $82,800 Implemented
OR0326 # 01 Y:1998 01 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $27,520 $83,400 Not Implemented