Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,504
matching recommendationsSIC | 37 | Transportation Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1052 # 05 Y:2023 | 05 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $13,453 | $9,000 | Not Implemented |
UD1052 # 06 Y:2023 | 06 | 2023 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $34,801 | $16,950 | Not Implemented |
IP0167 # 10 Y:2022 | 10 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,565 | $8,140 | Implemented |
IP0167 # 01 Y:2022 | 01 | 2022 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $17,520 | $2,500 | Not Implemented |
IP0167 # 02 Y:2022 | 02 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $33,801 | $3,457 | Implemented |
IP0167 # 03 Y:2022 | 03 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,573 | $475 | Implemented |
IP0167 # 04 Y:2022 | 04 | 2022 | AIR CONDITION ONLY SPACE NECESSARY | $6,333 | $2,520 | Implemented |
IP0167 # 05 Y:2022 | 05 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,306 | $3,300 | Not Implemented |
IP0167 # 06 Y:2022 | 06 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,236 | $2,330 | Not Implemented |
IP0167 # 07 Y:2022 | 07 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $369 | $730 | Not Implemented |
IP0167 # 08 Y:2022 | 08 | 2022 | USE RADIANT HEATER FOR SPOT HEATING | $10,286 | $21,879 | Not Implemented |
IP0167 # 09 Y:2022 | 09 | 2022 | OPTIMIZE PLANT POWER FACTOR | $11,341 | $26,639 | Implemented |
UL2217 # 01 Y:2022 | 01 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,769 | $4,795 | Not Implemented |
UL2217 # 02 Y:2022 | 02 | 2022 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $4,739 | $7,251 | Not Implemented |
UL2217 # 03 Y:2022 | 03 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,426 | $0 | Implemented |
UL2217 # 04 Y:2022 | 04 | 2022 | OPTIMIZE PLANT POWER FACTOR | $32,626 | $94,199 | Implemented |
UL2217 # 05 Y:2022 | 05 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,163 | $19,500 | Implemented |
UL2217 # 06 Y:2022 | 06 | 2022 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $7,602 | $50,000 | Implemented |
UL2217 # 07 Y:2022 | 07 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $6,919 | $102,018 | Not Implemented |
UL2217 # 08 Y:2022 | 08 | 2022 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $6,524 | $25,900 | Not Implemented |
UL2217 # 09 Y:2022 | 09 | 2022 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $33,279 | $0 | Implemented |
UL2217 # 10 Y:2022 | 10 | 2022 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $22,146 | $30,000 | Implemented |
UL2216 # 01 Y:2022 | 01 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,227 | $10,882 | Implemented |
UL2216 # 02 Y:2022 | 02 | 2022 | INSTALL OCCUPANCY SENSORS | $1,196 | $2,730 | Implemented |
UL2216 # 03 Y:2022 | 03 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,028 | $0 | Implemented |