IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

845

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0582 # 05 Y:1999 05 1999 SWITCH TO A SOLVENT THAT CAN BE CLEANED AND RE-USED $5,808 $3,600 Not Implemented
UD0582 # 06 Y:1999 06 1999 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,380 $4,000 Not Implemented
UD0547 # 01 Y:1998 01 1998 OPTIMIZE PLANT POWER FACTOR $228,030 $30,000 Implemented
UD0547 # 02 Y:1998 02 1998 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $143,713 $70,000 Not Implemented
UD0547 # 03 Y:1998 03 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $181,440 $75,000 Implemented
UD0547 # 04 Y:1998 04 1998 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $19,335 $28,000 Implemented
UD0547 # 05 Y:1998 05 1998 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID $7,988 $11,200 Not Implemented
UD0547 # 06 Y:1998 06 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,918 $0 Implemented
UD0547 # 07 Y:1998 07 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,126 $57,752 Implemented
UD0547 # 08 Y:1998 08 1998 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $11,849 $500 Implemented
WV0128 # 01 Y:1997 01 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $892 $150 Not Implemented
WV0128 # 02 Y:1997 02 1997 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $3,725 $550 Not Implemented
WV0128 # 03 Y:1997 03 1997 DIRECT WARMEST AIR TO COMBUSTION INTAKE $2,800 $4,700 Not Implemented
WV0128 # 04 Y:1997 04 1997 INSULATE BARE EQUIPMENT $9,736 $713 Not Implemented
WV0128 # 05 Y:1997 05 1997 INSULATE BARE EQUIPMENT $109 $33 Not Implemented
WV0128 # 06 Y:1997 06 1997 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $2,400 $6,300 Not Implemented
WV0128 # 07 Y:1997 07 1997 RECOVER AND REUSE COOLING WATER $2,540 $9,300 Not Implemented
WV0128 # 08 Y:1997 08 1997 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $202,500 $250,000 Not Implemented
UD0480 # 01 Y:1996 01 1996 RECOVER WASTE HEAT FROM EQUIPMENT $17,762 $53,000 Not Implemented
UD0480 # 02 Y:1996 02 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $43,980 $20,000 Not Implemented
UD0480 # 03 Y:1996 03 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,134 $10,224 Not Implemented
UD0480 # 04 Y:1996 04 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,452 $30,000 Not Implemented
UD0480 # 05 Y:1996 05 1996 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID $5,850 $0 Not Implemented
UD0480 # 06 Y:1996 06 1996 METER WASTE WATER $7,722 $1,000 Implemented
UD0480 # 07 Y:1996 07 1996 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $6,000 $6,000 Not Implemented