Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,773
matching recommendationsSIC | 37 | Transportation Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CI0050 # 02 Y:2025 | 02 | 2025 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $45,303 | $310,000 | n/a |
CI0050 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $87,810 | $829,924 | n/a |
MS0448 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $217,439 | $973,557 | n/a |
MS0448 # 02 Y:2025 | 02 | 2025 | AIR CONDITION ONLY SPACE NECESSARY | $48,357 | $35,751 | n/a |
MS0448 # 03 Y:2025 | 03 | 2025 | INSTALL REPLACEMENT DOORS | $10,741 | $15,697 | n/a |
MS0448 # 04 Y:2025 | 04 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,225 | $34,284 | n/a |
MS0448 # 05 Y:2025 | 05 | 2025 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $24,271 | $200,000 | n/a |
MS0448 # 06 Y:2025 | 06 | 2025 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $8,205 | $72,000 | n/a |
SD0674 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $40,920 | $211,796 | n/a |
SD0674 # 02 Y:2025 | 02 | 2025 | USE BATTERY STORAGE FOR DEMAND CONTROL | $229,613 | $34,559 | n/a |
SD0674 # 03 Y:2025 | 03 | 2025 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $3,362 | $5,179 | n/a |
SD0674 # 04 Y:2025 | 04 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,713 | $3,252 | n/a |
SD0674 # 05 Y:2025 | 05 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $955 | $0 | n/a |
SD0674 # 06 Y:2025 | 06 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,013 | $17,466 | n/a |
SD0674 # 07 Y:2025 | 07 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,881 | $5,022 | n/a |
SD0674 # 08 Y:2025 | 08 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $88,922 | $105,716 | n/a |
SD0674 # 09 Y:2025 | 09 | 2025 | ADOPT IN-HOUSE MATERIAL GENERATION | $238,196 | $464,200 | n/a |
SD0674 # 10 Y:2025 | 10 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $77 | $85 | n/a |
SD0674 # 11 Y:2025 | 11 | 2025 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $6,377 | $44,800 | n/a |
SD0674 # 12 Y:2025 | 12 | 2025 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $10,032 | $0 | n/a |
SD0674 # 13 Y:2025 | 13 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,593 | $3,237 | n/a |
MI0458 # 06 Y:2025 | 06 | 2025 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $3,821 | $10,749 | n/a |
MI0458 # 05 Y:2025 | 05 | 2025 | USE DIRECT AIR SUPPLY TO EXHAUST HOODS | $187 | $492 | n/a |
MI0458 # 04 Y:2025 | 04 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,923 | $7,236 | n/a |
MI0458 # 03 Y:2025 | 03 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $636 | $160 | n/a |