IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,504

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0306 # 04 Y:2022 04 2022 INSTALL OCCUPANCY SENSORS $247 $870 Implemented
MZ0306 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,459 $17,421 Not Implemented
MZ0306 # 06 Y:2022 06 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $640 $160 Not Implemented
MZ0306 # 07 Y:2022 07 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $8,283 $9,100 Not Implemented
MU0010 # 01 Y:2022 01 2022 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $14,187 $13,999 Implemented
MU0010 # 02 Y:2022 02 2022 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $4,866 $16,000 Implemented
MU0010 # 03 Y:2022 03 2022 MINIMIZE WATER USAGE $4,800 $11,427 Not Implemented
MU0010 # 04 Y:2022 04 2022 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $4,831 $4,350 Not Implemented
MU0010 # 05 Y:2022 05 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $842 $2,452 Implemented
MU0010 # 06 Y:2022 06 2022 INSTALL OCCUPANCY SENSORS $655 $619 Implemented
UA0258 # 01 Y:2022 01 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,172 $1,000 Implemented
UA0258 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,325 $2,961 Not Implemented
UA0258 # 03 Y:2022 03 2022 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $2,610 $7,484 Not Implemented
UA0258 # 04 Y:2022 04 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,159 $787 Implemented
UA0258 # 05 Y:2022 05 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $2,324 $2,000 Implemented
UA0258 # 06 Y:2022 06 2022 INSTALL OCCUPANCY SENSORS $1,756 $3,299 Implemented
TT0278 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,020 $107,478 Implemented
TT0278 # 02 Y:2022 02 2022 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $14,885 $400 Not Implemented
TT0278 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,152 $1,500 Implemented
TT0278 # 04 Y:2022 04 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $5,912 $18,000 Implemented
TT0278 # 05 Y:2022 05 2022 INSTALL TIMERS AND/OR THERMOSTATS $4,507 $150 Not Implemented
TT0278 # 06 Y:2022 06 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $4,143 $0 Not Implemented
TT0278 # 07 Y:2022 07 2022 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $3,425 $0 Implemented
TT0278 # 08 Y:2022 08 2022 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $2,362 $2,736 Implemented
UF0578 # 01 Y:2022 01 2022 USE DEMAND CONTROLLER OR LOAD SHEDDER $15,842 $11,742 Implemented