IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,504

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0019 # 01 Y:1982 01 1982 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $550 $150 Implemented
UD0019 # 02 Y:1982 02 1982 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,596 $5,400 Implemented
UD0023 # 01 Y:1982 01 1982 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $7,104 $6,705 Implemented
UD0023 # 02 Y:1982 02 1982 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $14,006 $3,864 Implemented
UD0023 # 03 Y:1982 03 1982 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,266 $300 Implemented
UD0024 # 01 Y:1982 01 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $611 $350 Not Implemented
UD0024 # 02 Y:1982 02 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,472 $0 Not Implemented
UD0024 # 03 Y:1982 03 1982 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,200 $1,000 Not Implemented
KU0025 # 01 Y:1981 01 1981 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $169 $100 Implemented
KU0025 # 02 Y:1981 02 1981 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $1,267 $1,200 Not Implemented
KU0025 # 03 Y:1981 03 1981 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $992 $0 Not Implemented
KU0025 # 04 Y:1981 04 1981 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $685 $2,076 Not Implemented
KU0025 # 05 Y:1981 05 1981 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,689 $3,748 Implemented
KU0027 # 01 Y:1981 01 1981 INSTALL AUTOMATIC STACK DAMPER $1,605 $1,800 Not Implemented
KU0027 # 02 Y:1981 02 1981 INSTALL TIMERS AND/OR THERMOSTATS $5,685 $1,600 Not Implemented
KU0027 # 03 Y:1981 03 1981 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD $700 $0 Not Implemented
KU0027 # 04 Y:1981 04 1981 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $405 $100 Not Implemented
KU0027 # 05 Y:1981 05 1981 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $200 $0 Not Implemented
KU0027 # 06 Y:1981 06 1981 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $160 $300 Not Implemented
KU0027 # 07 Y:1981 07 1981 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $185 $0 Not Implemented
KU0027 # 08 Y:1981 08 1981 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,845 $0 Not Implemented
KU0027 # 09 Y:1981 09 1981 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,720 $5,466 Not Implemented
KU0023 # 01 Y:1981 01 1981 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,821 $3,500 Not Implemented
KU0023 # 02 Y:1981 02 1981 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,230 $0 Not Implemented
KU0023 # 03 Y:1981 03 1981 RECOVER WASTE HEAT FROM EQUIPMENT $810 $2,100 Not Implemented