IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

130

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0189 # 06 Y:2011 06 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $43 $58 Implemented
IC0189 # 07 Y:2011 07 2011 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $294 $0 Not Implemented
IC0129 # 01 Y:2007 01 2007 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $14,537 $81,554 Implemented
IC0129 # 02 Y:2007 02 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,611 $1,035 Implemented
IC0129 # 03 Y:2007 03 2007 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,183 $4,040 Not Implemented
IC0129 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,613 $22,008 Implemented
IC0129 # 05 Y:2007 05 2007 UPGRADE CONTROLS ON COMPRESSORS $561 $0 Implemented
IC0129 # 06 Y:2007 06 2007 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $2,946 $2,902 Implemented
IC0129 # 07 Y:2007 07 2007 INSTALL OCCUPANCY SENSORS $506 $1,782 Implemented
IC0129 # 08 Y:2007 08 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,264 $0 Implemented
WI0522 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $69,304 $182,880 Implemented
WI0522 # 02 Y:2006 02 2006 IMPROVE SPACE COMFORT CONDITIONING $14,000 $3,000 Implemented
WI0522 # 03 Y:2006 03 2006 RECOVER WASTE HEAT FROM EQUIPMENT $12,607 $2,000 Implemented
WI0522 # 04 Y:2006 04 2006 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $7,457 $3,000 Not Implemented
WI0522 # 05 Y:2006 05 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,685 $1,920 Implemented
WI0522 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,544 $0 Implemented
WI0522 # 07 Y:2006 07 2006 DISTILL CONTAMINATED SOLVENTS FOR REUSE $4,560 $12,105 Not Implemented
WI0510 # 01 Y:2006 01 2006 INSTALL TIMERS AND/OR THERMOSTATS $12,014 $0 Implemented
WI0510 # 02 Y:2006 02 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,865 $2,000 Not Implemented
WI0510 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,944 $23,000 Implemented
WI0510 # 04 Y:2006 04 2006 RECOVER WASTE HEAT FROM EQUIPMENT $4,554 $1,000 Not Implemented
WI0510 # 05 Y:2006 05 2006 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $32,657 $3,352 Not Implemented
WI0510 # 06 Y:2006 06 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,135 $640 Implemented
WI0510 # 07 Y:2006 07 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $443 $438 Not Implemented
WI0510 # 08 Y:2006 08 2006 INSTALL SET-BACK TIMERS $340 $100 Implemented