IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

334

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0527 # 11 Y:2014 11 2014 DEVELOP A REPAIR/REPLACE POLICY $1,768 $4,256 Implemented
NC0527 # 12 Y:2014 12 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $893 $180 Not Implemented
BS0036 # 07 Y:2014 07 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,898 $2,032 Implemented
BS0036 # 01 Y:2014 01 2014 USE OPTIMUM THICKNESS INSULATION $17,744 $26,100 Not Implemented
BS0036 # 02 Y:2014 02 2014 INSTALL REPLACEMENT DOORS $4,556 $17,436 Not Implemented
BS0036 # 03 Y:2014 03 2014 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $16,582 $31,134 Not Implemented
BS0036 # 04 Y:2014 04 2014 RECOVER WASTE HEAT FROM EQUIPMENT $2,961 $10,130 Not Implemented
BS0036 # 05 Y:2014 05 2014 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $10,250 $11,371 Not Implemented
BS0036 # 06 Y:2014 06 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,963 $937 Implemented
OK0889 # 11 Y:2014 11 2014 OPTIMIZE PLANT POWER FACTOR $4,264 $2,925 Not Implemented
OK0889 # 10 Y:2014 10 2014 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $2,920 $10,599 Implemented
OK0889 # 09 Y:2014 09 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $1,124 $239 Implemented
OK0889 # 08 Y:2014 08 2014 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $815 $250 Not Implemented
OK0889 # 07 Y:2014 07 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,946 $320 Not Implemented
OK0889 # 06 Y:2014 06 2014 INSTALL OCCUPANCY SENSORS $200 $696 Not Implemented
OK0889 # 05 Y:2014 05 2014 INSTALL OCCUPANCY SENSORS $1,519 $5,372 Not Implemented
OK0889 # 04 Y:2014 04 2014 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $4,444 $6,994 Not Implemented
OK0889 # 03 Y:2014 03 2014 INSTALL TIMERS AND/OR THERMOSTATS $10,189 $4,650 Implemented
OK0889 # 02 Y:2014 02 2014 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $4,415 $7,547 Not Implemented
OK0889 # 01 Y:2014 01 2014 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $15,746 $14,500 Not Implemented
MI0266 # 01 Y:2014 01 2014 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $12,844 $14,320 Not Implemented
MI0266 # 09 Y:2014 09 2014 USE PHOTOCELL CONTROLS $1,450 $360 Implemented
MI0266 # 08 Y:2014 08 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,899 $80 Implemented
MI0266 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,344 $9,120 Implemented
MI0266 # 06 Y:2014 06 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,486 $1,310 Implemented