IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,504

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0956 # 04 Y:2021 04 2021 INSTALL OCCUPANCY SENSORS $826 $625 Implemented
GT0956 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,593 $3,220 Implemented
GT0956 # 06 Y:2021 06 2021 USE SOLAR HEAT TO MAKE ELECTRICTY $31,203 $419,703 Implemented
NC0661 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,982 $3,360 n/a
NC0661 # 02 Y:2021 02 2021 RECOVER WASTE HEAT FROM EQUIPMENT $6,073 $27,600 n/a
NC0661 # 03 Y:2021 03 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,376 $4,000 n/a
NC0661 # 04 Y:2021 04 2021 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $2,158 $2,300 n/a
TT0253 # 01 Y:2021 01 2021 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $63,457 $40,000 Implemented
TT0253 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,898 $70,582 Implemented
TT0253 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,036 $3,000 Not Implemented
TT0253 # 04 Y:2021 04 2021 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $7,829 $1,408 Not Implemented
TT0253 # 05 Y:2021 05 2021 INSTALL TIMERS AND/OR THERMOSTATS $479 $900 Implemented
TT0253 # 06 Y:2021 06 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $395 $40 Not Implemented
TT0253 # 07 Y:2021 07 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $281 $500 Implemented
TT0253 # 08 Y:2021 08 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $245 $25 Implemented
UA0239 # 01 Y:2021 01 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,194 $50 Implemented
UA0239 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,993 $2,238 Implemented
UA0239 # 03 Y:2021 03 2021 OPTIMIZE PLANT POWER FACTOR $12,847 $4,947 Not Implemented
UA0239 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,348 $23,987 Implemented
UA0239 # 05 Y:2021 05 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $364 $51 Implemented
UA0239 # 06 Y:2021 06 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,641 $9,144 Not Implemented
UA0239 # 07 Y:2021 07 2021 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $18,822 $2,500 Not Implemented
UA0239 # 08 Y:2021 08 2021 USE RADIANT HEATER FOR SPOT HEATING $794 $709 Not Implemented
OK1045 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,011 $14,146 Implemented
OK1045 # 02 Y:2021 02 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $3,431 $0 Implemented