IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

471

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0977 # 06 Y:2017 06 2017 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $16,048 $2,000 Implemented
UD0977 # 07 Y:2017 07 2017 OPTIMIZE PLANT POWER FACTOR $3,320 $6,000 Not Implemented
UD0977 # 08 Y:2017 08 2017 ADD AREA LIGHTING SWITCHES $745 $0 Implemented
UD0977 # 09 Y:2017 09 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,687 $57,949 Not Implemented
IC0195 # 01 Y:2017 01 2017 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $7,465 $3,408 Not Implemented
IC0195 # 02 Y:2017 02 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,938 $3,125 Not Implemented
IC0195 # 03 Y:2017 03 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $881 $60 Not Implemented
IC0195 # 04 Y:2017 04 2017 USE MINIMUM STEAM OPERATING PRESSURE $457 $0 Not Implemented
IC0195 # 05 Y:2017 05 2017 INSTALL / REPAIR INSULATION ON STEAM LINES $49 $6 Not Implemented
IC0195 # 06 Y:2017 06 2017 REPLACE BOILER $183,000 $30,000 Implemented
IC0195 # 07 Y:2017 07 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $32,126 $16,175 Not Implemented
IC0195 # 08 Y:2017 08 2017 UPGRADE CONTROLS ON COMPRESSORS $3,210 $2,555 Not Implemented
IC0195 # 09 Y:2017 09 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,417 $5,650 Implemented
IC0195 # 10 Y:2017 10 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,782 $11,163 Implemented
IC0195 # 11 Y:2017 11 2017 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $697,569 $2,619,820 Not Implemented
IP0084 # 01 Y:2017 01 2017 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,043 $0 Not Implemented
IP0084 # 02 Y:2017 02 2017 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $131 $0 Implemented
IP0084 # 03 Y:2017 03 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $383 $4 Not Implemented
IP0084 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,458 $65 Implemented
IP0084 # 05 Y:2017 05 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,415 $130 Implemented
IP0084 # 06 Y:2017 06 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,221 $290 Implemented
IP0084 # 07 Y:2017 07 2017 INSULATE BARE EQUIPMENT $974 $203 Implemented
IP0084 # 08 Y:2017 08 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,534 $928 Not Implemented
IP0084 # 09 Y:2017 09 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $910 $416 Not Implemented
IP0084 # 10 Y:2017 10 2017 APPLY FOR INVESTMENT INCENTIVES $238 $125 Not Implemented