IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

187

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0157 # 03 Y:1999 03 1999 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,445 $2,052 Not Implemented
WV0157 # 04 Y:1999 04 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,203 $520 Implemented
WV0157 # 05 Y:1999 05 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,009 $977 Implemented
WV0157 # 06 Y:1999 06 1999 INSULATE BARE EQUIPMENT $623 $450 Not Implemented
WV0157 # 07 Y:1999 07 1999 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,485 $7,500 Not Implemented
WV0157 # 08 Y:1999 08 1999 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $1,488 $1,650 Not Implemented
WV0157 # 09 Y:1999 09 1999 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $3,445 $1,000 Implemented
WV0157 # 10 Y:1999 10 1999 OPTIMIZE PLANT POWER FACTOR $1,059 $1,879 Not Implemented
WV0157 # 11 Y:1999 11 1999 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,812 $224 Implemented
WV0157 # 12 Y:1999 12 1999 PAY UTILITY BILLS ON TIME $328 $0 Implemented
WV0157 # 13 Y:1999 13 1999 USE EVAPORATION TO CONCENTRATE MATERIAL $7,217 $4,265 Not Implemented
WV0157 # 14 Y:1999 14 1999 UTILIZE OUTSIDE CONTRACTING $14,816 $0 Implemented
WV0157 # 15 Y:1999 15 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $146,629 $250,000 Not Implemented
WV0157 # 16 Y:1999 16 1999 CHANGE OPERATING CONDITIONS $2,437 $0 Not Implemented
HO0170 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,110 $35,934 Implemented
HO0170 # 02 Y:1998 02 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $652 $500 Implemented
HO0170 # 03 Y:1998 03 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $920 $20 Implemented
HO0170 # 04 Y:1998 04 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $455 $60 Implemented
HO0170 # 05 Y:1998 05 1998 RECOVER WASTE HEAT FROM EQUIPMENT $1,250 $200 Not Implemented
HO0170 # 06 Y:1998 06 1998 USE RADIANT HEATER FOR SPOT HEATING $3,205 $9,600 Implemented
HO0170 # 07 Y:1998 07 1998 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $774 $750 Implemented
HO0170 # 08 Y:1998 08 1998 INSTALL AUTOMATIC PACKING EQUIPMENT $4,800 $5,200 Implemented
HO0170 # 09 Y:1998 09 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $611 $500 Implemented
HO0170 # 10 Y:1998 10 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $15,000 $1,040 Not Implemented
HO0170 # 11 Y:1998 11 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $24,440 $500 Not Implemented