IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

194

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0717 # 07 Y:2015 07 2015 RECOVER WASTE HEAT FROM EQUIPMENT $1,080 $3,220 n/a
CO0717 # 06 Y:2015 06 2015 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $3,270 $1,000 n/a
CO0717 # 05 Y:2015 05 2015 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $3,660 $13,800 n/a
CO0717 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,880 $35,080 n/a
CO0717 # 03 Y:2015 03 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $380 $100 n/a
CO0717 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $470 $480 n/a
CO0717 # 01 Y:2015 01 2015 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $1,160 $2,130 n/a
CO0698 # 01 Y:2014 01 2014 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,950 $300 Not Implemented
CO0698 # 02 Y:2014 02 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,570 $500 Implemented
CO0698 # 04 Y:2014 04 2014 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $6,000 $1,500 Not Implemented
CO0698 # 03 Y:2014 03 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,800 $16,900 Implemented
CO0644 # 03 Y:2010 03 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,030 $35,000 Implemented
CO0644 # 05 Y:2010 05 2010 USE SOLAR HEAT TO MAKE ELECTRICTY $2,500 $27,500 Not Implemented
CO0644 # 06 Y:2010 06 2010 REDUCE VENTILATION AIR $1,390 $12,400 Implemented
CO0644 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,750 $1,000 Implemented
CO0644 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,520 $1,000 Implemented
CO0644 # 04 Y:2010 04 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,750 $15,000 Implemented
CO0619 # 01 Y:2009 01 2009 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $37,130 $140,000 Implemented
CO0619 # 05 Y:2009 05 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $530 $400 Implemented
CO0619 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $790 $2,150 Not Implemented
CO0619 # 02 Y:2009 02 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $270 $580 Implemented
CO0619 # 03 Y:2009 03 2009 USE PHOTOCELL CONTROLS $1,710 $20,000 Implemented
CO0550 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,000 $180 Implemented
CO0550 # 02 Y:2004 02 2004 DISTILL CONTAMINATED SOLVENTS FOR REUSE $1,720 $6,070 Not Implemented
CO0550 # 01 Y:2004 01 2004 RECOVER WASTE HEAT FROM EQUIPMENT $1,960 $2,000 Implemented