IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

231

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CC0029 # 06 Y:2023 06 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $129,919 $1,308,548 n/a
CC0029 # 07 Y:2023 07 2023 RECOVER WASTE HEAT FROM EQUIPMENT $38,352 $125,706 n/a
CC0029 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $74,488 $34,000 n/a
CC0029 # 04 Y:2023 04 2023 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $12,405 $5,000 n/a
CC0029 # 03 Y:2023 03 2023 MAINTAIN MACHINES TO REDUCE LEAKS $11,616 $5,629 n/a
CC0029 # 02 Y:2023 02 2023 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $29,619 $32,820 n/a
CC0029 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $30,487 $10,000 n/a
NC0661 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,982 $3,360 n/a
NC0661 # 02 Y:2021 02 2021 RECOVER WASTE HEAT FROM EQUIPMENT $6,073 $27,600 n/a
NC0661 # 03 Y:2021 03 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,376 $4,000 n/a
NC0661 # 04 Y:2021 04 2021 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $2,158 $2,300 n/a
NC0655 # 03 Y:2020 03 2020 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $12,039 $500 Not Implemented
NC0655 # 02 Y:2020 02 2020 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $49,654 $612,000 Not Implemented
NC0655 # 01 Y:2020 01 2020 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $92,988 $168,000 Not Implemented
NC0655 # 04 Y:2020 04 2020 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $310 $500 Implemented
NC0635 # 03 Y:2019 03 2019 INSTALL / REPAIR INSULATION ON STEAM LINES $2,154 $3,120 Not Implemented
NC0635 # 05 Y:2019 05 2019 INSULATE BARE EQUIPMENT $9,539 $12,600 Not Implemented
NC0635 # 02 Y:2019 02 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,794 $30,000 Implemented
NC0635 # 01 Y:2019 01 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $483 $600 Implemented
NC0635 # 04 Y:2019 04 2019 REPAIR AND ELIMINATE STEAM LEAKS $2,165 $850 Implemented
NC0622 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,812 $46,617 Implemented
NC0622 # 08 Y:2018 08 2018 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $10,727 $28,500 Not Implemented
NC0622 # 06 Y:2018 06 2018 RECOVER WASTE HEAT FROM EQUIPMENT $4,913 $8,000 Not Implemented
NC0622 # 02 Y:2018 02 2018 INSTALL OCCUPANCY SENSORS $481 $250 Implemented
NC0622 # 07 Y:2018 07 2018 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,221 $1,000 Not Implemented