IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

89

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NL0084 # 08 Y:2023 08 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $366 $580 n/a
NL0084 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $41,028 $500 n/a
NL0084 # 01 Y:2023 01 2023 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $84,081 $91,000 n/a
NL0084 # 07 Y:2023 07 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,201 $2,875 n/a
NL0084 # 06 Y:2023 06 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,562 $9,563 n/a
NL0084 # 05 Y:2023 05 2023 METER WASTE WATER $10,034 $9,984 n/a
NL0084 # 04 Y:2023 04 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $17,812 $13,150 n/a
NL0084 # 03 Y:2023 03 2023 ADOPT IN-HOUSE MATERIAL GENERATION $24,791 $50,000 n/a
NL0065 # 09 Y:2022 09 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,199 $4,780 Not Implemented
NL0065 # 11 Y:2022 11 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $990 $943 Not Implemented
NL0065 # 01 Y:2022 01 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $102,048 $20,000 Implemented
NL0065 # 02 Y:2022 02 2022 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $66,280 $33,738 Not Implemented
NL0065 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,531 $4,500 Implemented
NL0065 # 03 Y:2022 03 2022 RECOVER AND REUSE COOLING WATER $66,179 $102,065 Implemented
NL0065 # 08 Y:2022 08 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,026 $43 Not Implemented
NL0065 # 10 Y:2022 10 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,554 $5,468 Implemented
NL0065 # 05 Y:2022 05 2022 RECOVER WASTE HEAT FROM EQUIPMENT $32,997 $9,000 Not Implemented
NL0065 # 07 Y:2022 07 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $9,268 $4,025 Not Implemented
NL0065 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $36,067 $72,620 Implemented
NL0058 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,510 $2,500 Implemented
NL0058 # 03 Y:2021 03 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,369 $6,060 Implemented
NL0058 # 02 Y:2021 02 2021 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $24,583 $30,000 Not Implemented
NL0058 # 06 Y:2021 06 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,164 $728 Not Implemented
NL0058 # 05 Y:2021 05 2021 METER WASTE WATER $2,893 $1,106 Not Implemented
NL0058 # 01 Y:2021 01 2021 USE SOLAR HEAT TO MAKE ELECTRICTY $282,217 $1,200,000 Not Implemented